Traffic Updates

Want to receive traffic updates instantly? Follow us on Twitter.

Please click here for a Northeast Anthony Henday Drive Project Map, of all the road openings that are available through the winter months of 2015/2016 (indicated in red). The map also specifies what will be opened on the Project's Traffic Availability Date (indicated in yellow).

 

October 2016

October 1, 4:00 PM - Northeast Anthony Henday Drive officially opens to traffic.

October 1, 2:00 PM - The westbound Yellowhead Trail to northbound northbound Anthony Henday Drive ramp will be open.

September 2016

September 30 - The southhbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be open.

September 28 - The southbound Anthony Henday Drive to eastbound Yellowhead Trail flyover is open.

September 28 - The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp is open.

September 25, 6:00 AM to September 26, 5:00 AM - The 17 Street and Sherwood Park Freeway Interchange will be closed. This traffic impact is required for guardrail and minor signs installation for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 34 Street Interchange instead. Detour signage will be in place to direct commuters.

September 24, 6:00 AM to 5:00 PM - The westbound Sherwood Park Freeway to northbound/ southbound 34 Street ramp will be closed. This traffic impact is required for the removal and installation of lights for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street Interchange. Detour signage will be in place to direct commuters.

September 22, 7:00 PM to September 26, 5:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

September 21, 7:00 PM to September 22, 5:00 AM - The westbound Baseline Road to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for rail placement for the Northeast Anthony Henday Drive Project. Traffic on westbound Baseline Road is advised to turn around at the 17 Street and Baseline Road Interchange, and head eastbound on Baseline Road to take the southbound Anthony Henday Drive exit. Detour signage will be in place to direct commuters.

September 19 to 21 (nightly) - Northbound and southbound Broadmoor Boulevard will be closed between Pembina Road/ Strathmoor Drive and the Yellowhead Trail Interchange. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Northbound traffic is advised to turn right on Lakeland Drive and then turn left on Sherwood Drive to head northbound. Traffic on eastbound Yellowhead Trail wanting to turn southbound on Broadmoor Boulevard is advised to take the Sherwood Drive exit, and then turn right on Lakeland Drive to access southbound Broadmoor Boulevard. Detour signage will be in place to direct commuters.

September 17, 7:00 PM to September 19, 5:00 AM - The 17 Street and Sherwood Park Freeway Interchange will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 34 Street Interchange instead. Detour signage will be in place to direct commuters.

September 18, 6:00 AM to 6:00 PM - The 17 Street/ Hayter Road to westbound Yellowhead Trail ramp will be closed. This traffic impact is required for barrier forming for the Northeast Anthony Henday Drive Project. Traffic will be detoured to Baseline Road to access northbound Anthony Henday Drive. Traffic can then use the northbound Anthony Henday Drive to westbound Yellowhead Trail loop to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

September 16, 7:00 AM - The entrance from southbound Anthony Henday by the Whitemud Drive to Meridian Street/ 1st Street will be permanently closed. Traffic is advised to use the new 76 Avenue exit from 17 Street.

15 and September 16 (nightly) - The 17 Street and Sherwood Park Freeway Interchange will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 34 Street Interchange instead. Detour signage will be in place to direct commuters.

September 13, 5:00 AM - The new eastbound Yellowhead Trail (east of Beverly bridge) to northbound Anthony Henday Drive ramp will be open. This is the permanent alignment for the eastbound Yellowhead Trail to northbound Anthony Henday Drive ramp.

September 13, 5:00 AM - The right-out from Hayter Road to westbound Yellowhead Trail is scheduled to open. Once this right-out is open, the 116 Avenue/ eastbound Yellowhead Trail to northbound Anthony Henday Drive exit will be permanently closed. Traffic on 116 Avenue is advised to head southbound on 17 Street and then head easbound on Baseline Road to access northbound Anthony Henday Drive. Signage will be in place to advise commuters.

September 13, 5:00 AM - A single lane of traffic will be open on southbound Anthony Henday Drive from Aurum Road. The left turn currently allowing access to westbound Yellowhead Trail from southbound Anthony Henday Drive will no longer be operational. Traffic is advised to exit at Baseline Road and then use 17 Street northbound to the 17 Street/ Hayter Road right-out to access westbound Yellowhead Trail. Signage will be in place to advise commuters.

September 12 - The eastbound Sherwood Park Freeway to northbound Anthony Henday Drive ramp will be permanently closed. Traffic is advised to use 17 Street and Baseline Road to access northbound Anthony Henday Drive.

September 12 - The eastbound Whitemud Drive to northbound Anthony Henday Drive and northbound Anthony Henday Drive to westbound Whitemud Drive ramps will be open. The CD road will also be open.

September 11, 6:00 AM to 1:00 PM - The eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to exit off at the 116 Avenue Interchange and use 17 Street NW southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

September 11, 6:00 AM to September 12, 5:00 AM - The 34 Street and Sherwood Park Freeway Interchange will be closed. The 34 Street bridge over Sherwood Park Freeway will also be closed. This traffic impact is required for lights and signs installations for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street Interchange. Detour signage will be in place to direct commuters.

September 10, 11:00 PM to September 12, 4:00 AM - The eastbound Anthony Henday Drive to northbound Manning Drive ramp will be closed. This traffic impact is required for a transition barrier pour for the Northeast Anthony Henday Drive Project. Traffic is advised to head southbound on Manning Drive and then turn left on 144 Avenue to head northbound on Manning Drive. Detour signage will be in place to direct commuters.

September 10, 7:00 AM to 7:00 PM - The northbound Anthony Henday Drive to eastbound Whitemud Drive/ Township Rd 522 ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use Wye Road to head eastbound instead. Detour signage will be in place to direct commuters.

September 10, 10:00 PM to September 11, 3:00 AM - Northbound Anthony Henday Drive at the Sherwood Park Freeway/ Wye Road Interchange will be closed. This traffic impact is required for an overhead sign installation for the Northeast Anthony Henday Drive Project. Traffic is advised to exit at 17 Street and head northbound to Baseline Road, and then travel eastbound on Baseline Road to access northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

September 9, 10:00 PM to September 10, 2:00 AM - The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed. This traffic impact is required for an overhead sign installation for the Northeast Anthony Henday Drive Project. Traffic is advised to exit at Baseline Road and head eastbound to Broadmoor Boulevard, and use Broadmoor Boulevard northbound to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

September 4, 7:00 AM to 5:00 PM - Traffic on eastbound Anthony Henday Drive will be reduced to a single lane (pushed on to the left shoulder) at the Manning Drive Interchange. This traffic impact is required for sign installation for the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.

September 3, 7:00 AM to 3:00 PM - The southbound Manning Drive to westbound Anthony Henday Drive ramp will be closed. This traffic impact is required for sign installations for the Northeast Anthony Henday Drive Project. Traffic is advised to exit off at 167 Avenue, and head northbound on 66 Street NW to access westbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 2016

August 31 & September 1 (daily) - The eastbound Sherwood Park Freeway to northbound Anthony Henday Drive ramp will be closed. This traffic impact is required for road widening as part of the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street to Baseline Road to access northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 30 to September 1 (nightly) - The eastbound Baseline Road to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to head southbound on 17 Street and then exit onto eastbound Sherwood Park Freeway and to access the southbound Anthony Henday Drive ramp here. Detour signage will be in place to direct commuters.

August 30, 7:00 PM to August 31, 5:30 AM - The westbound Wye Road to northbound Anthony Henday Drive and the eastbound Sherwood Park Freeway to northbound Anthony Henday Drive ramps will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street to Baseline Road, and then head eastbound on Baseline Road to access northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 29, 9:00 PM to August 30, 5:30 AM - The westbound Wye Road to northbound Anthony Henday Drive ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street to Baseline Road, and then head eastbound on Baseline Road to access Northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 29, 7:00 PM to August 30, 5:30 AM - The eastbound Wye Road to northbound Anthony Henday Drive ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street to Baseline Road, and then head eastbound on Baseline Road to access Northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 27, 8:00 PM to August 28, 4:30 AM - This impact affects the span of Anthony Henday Drive south of Sherwood Park Freeway and north of Whitemud Drive. The left lane of northbound Anthony Henday Drive will be closed at 8:00 PM, and one lane of traffic will be maintained. Northbound Anthony Henday Drive traffic will be stopped completely around 12:00 AM for approximately 20 minutes. Similary, the right lane of southbound Anthony Henday Drive will be closed shortly after, and one lane of traffic will be maintained. Southbound traffic will be stopped completely around 4:00 AM for approximately 20 minutes, and one lane of traffic will be maintained after the stoppage. This traffic impact is required to install signage for the Northeast Anthony Henday Drive Project. Southbound Anthony Henday Drive traffic north of Sherwood Park Freeway is advised to travel west on Sherwood Park Freeway and use 17 Street as a detour to Whitemud Drive and Anthony Henday Drive. Northbound Anthony Henday Drive traffic south of Whitemud Drive is advised to travel west on Whitemud Drive and use 17 Street as a detour to Sherwood Park Freeway. Detour signage will be in place to direct commuters.

August 27, 8:00 PM to August 28, 9:00 AM - The westbound Wye Road to northbound Anthony Henday Drive and the eastbound Wye Road to northbound Anthony Henday Drive ramps will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street to Baseline Road, and then head eastbound on Baseline Road to access northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 26, 8:00 PM to August 27, 7:00 AM - The northbound Anthony Henday Drive to eastbound Wye Road exit will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic will be detoured to Baseline Road. Detour signage will be in place to direct commuters.

August 26, 6:00 PM to August 29, 5:00 AM - The cul-de-sac by Our Lady of Peace cemetary will be closed. This traffic impact is required for road construction work for the Northeast Anthony Henday Drive Project. Traffic will still be able to access Our Lady of Peace cemetary, and no routes are affected by this impact.

August 24, 9:00 AM to 3:00 PM (weather permitting) - The eastbound Wye Road to northbound Anthony Henday Drive ramp will be closed. This traffic impact is required to haul materials for the Northeast Anthony Henday Drive Project. Traffic is advised to travel eastbound on Wye Road, turn left on Sherwood Drive, and continue northbound on Broadmoor Boulevard towards Baseline Road. Traffic will turn left on Baseline Road and will access northbound Anthony Henday Drive from the westbound Baseline Road to northbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

August 19, 6:00 PM to August 22, 5:00 AM - Traffic travelling to businesses north of the Hurstwood right-in/right-out using 17 Street and 76 Avenue will not be able to access the temporary right-out south of the Hurstwood right-in/right-out. Traffic will have to exit back onto 76 Avenue, and use 17 Street to access the highway. Similarly, traffic exiting onto Meridian Street using the temporary right-in from Anthony Henday Drive will not be able to access businesses north of the Hurstwood right-in/right-out; this traffic must travel on 17 Street and use 76 Avenue to get to businesses north of the Hurstwood right-in/right-out. This traffic impact is required for road construction at the Hurstwood right-in/right-out.

August 18, 7:00 PM to August 19, 6:00 AM - The westbound Baseline Road to southbound Anthony Henday Drive loop ramp and the eastbound Baseline Road to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for paving work for the Northeast Anthony Henday Drive Project. Traffic is advsied to travel southbound on 17 Street to Sherwood Park Freeway and then to travel eastbound to access southbound Anthony Henday Drive.

August 17, 7:00 PM to August 18, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 11, 7:00 PM to August 12, 5:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required to pump water out at the barriers as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

August 5, 7:00 PM to August 7, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 4, 10:00 PM to August 5, 5:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required for a barrier pour as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

August 3, 7:00 PM to August 4, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a sign installation and a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 2016

July 30, 7:00 PM to July 31, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a sign installation for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 27, 7:00 PM to July 28, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 25, 7:00 PM to July 26, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 24, 6:00 AM to 12:00 PM - The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use the Baseline Road exit off Anthony Henday Drive and then use Sherwood Drive to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

July 23, 7:00 PM to July 24, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a traffic sign installation for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 21, 5:00 AM to July 28, 5:00 AM - The northbound Anthony Henday Drive to eastbound Whitemud Drive/ Township Rd 522 ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use Wye Road to head eastbound instead. Detour signage will be in place to direct commuters.

July 20, 7:00 PM to July 21, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 20, 4:00 AM to August 31, 6:00 AM - The northbound Anthony Henday Drive to westbound Whitemud Drive ramp and the eastbound Whitemud Drive to northbound Anthony Henday Drive ramp will be closed. At this time, the northbound CD road will also be closed. Traffic is advised to use Sherwood Park Freeway and 17 Street as a detour. Detour signage will be in place to direct commuters.

July 20, 3:00 AM - The southbound Anthony Henday Drive to eastbound Whitemud Drive ramp and the westbound Whitemud Drive to southbound Anthony Henday Drive ramp will be open. At this time, the west CD road will also be open.


July 16, 8:00 PM to July 17, 6:00 AM -
The westbound Baseline Road to northbound Anthony Henday Drive ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic will be detoured westbound on Baseline Road to 17 Street and can use 116 Avenue to access eastbound Yellowhead Trail to northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 16, 6:00 AM to 5:00 PM - Westbound Yellowhead Trail will be reduced to one lane of traffic between Sherwood Drive and Broadmoor Boulevard. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Detour signage will be in place to notify commuters.


July 16, 5:00 AM to July 17, 6:00 PM - The Yellowhead Trail NE service road will be closed. This traffic impact is required for a culvert installation as part of the Northeast Anthony Henday Drive Project. Traffic is advised to use 24 Street or 28 Street instead. Detour signage will be in place to direct commuters.

July 16, 3:00 AM to 4:00 AM - Westbound Yellowhead Trail will be closed to the east of the Beverly Bridge. This traffic impact is required for sign removal as part of the Northeast Anthony Henday Drive Project. Police will be present at the hard closure of westbound Yellowhead Trail. A detour will be available by exiting on 17 Street south, heading west on 101 Avenue, and then north on 75 Street to access westbound Yellowhead Trail.

July 15, 8:00 PM to July 17, 6:00 AM - The eastbound Baseline Road to southbound Anthony Henday Drive directional ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic is advised to use 17 Street or 34 Street to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 13 to 18 (nightly) -
The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.


July 13, 9:00 AM to 3:00 PM
- The northbound/southbound 34 Street to eastbound Sherwood Park Freeway ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Commuters will be detoured to the 17 Street interchange to head eastbound on Sherwood Park Freeway. Detour signage will be in place to direct commuters.

July 11, 7:00 PM to July 12, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 10, 6:00 AM to 6:00 PM - The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use the Baseline Road exit off Anthony Henday Drive and then use Sherwood Drive to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

July 9, 5:00 AM to August 23, 5:00 AM (weather dependent) - Access to westbound Yellowhead Trail from 17 Street NW / Hayter Road will be closed temporarily for approximately 6 weeks. This closure will occur once the 15 Street NW and 116 Avenue intersection has reopened. This closure is required to reconstruct westbound Yellowhead Trail as per the final design for the Northeast Anthony Henday Drive Project. A detour will be available by following 116 Avenue to eastbound Yellowhead Trail, then using the eastbound Yellowhead Trail to northbound Anthony Henday Drive loop ramp and then the northbound Anthony Henday Drive to westbound Yellowhead Trail ramp. Detour signage will be in place to direct commuters. Please click on the link below for a map of the detour.

Westbound Yellowhead Trail Detour

July 8, 8:00 PM to July 9, 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 7, 7:00 PM to July 8, 2:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail and head southbound to Baseline Road to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

July 5, 7:00 PM to July 9, 5:00 AM (weather dependent) - The intersection at 15 Street NW and 116 Avenue will be closed. There will be no access to eastbound Yellowhead Trail from 17 Street NW. Traffic is advised to use Baseline Road to northbound Anthony Henday Drive and then use the Lloydminster exit to access eastbound Yellowhead Trail. Alternatively, traffic could also access westbound Yellowhead Trail from Hayter Road and head to Victoria Trail to access eastbound Yellowhead Trail. Victoria Trail is a restricted truck route. Trucks are advised to use the 50 Street exit to turn around to access eastbound Yellowhead Trail. Additionally, there will be no access from eastbound Yellowhead Trail to southbound 17 Street NW. Traffic is advised to use the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to Baseline Road to access 17 Street. This traffic impact is required for construction of this intersection as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

July 1, 5:00 AM to July 22, 5:00 AM - 1st Street will be closed at 92 Avenue. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. A new right-in and right-out at 1st Street will be available at southbound Anthony Henday Drive, north of the southbound Anthony Henday Drive to westbound Sherwood Park Freeway ramp. Traffic is advised to use 17 Street NW to Baseline Road to access southbound Anthony Henday Drive to the right-in and right-out.

July 1, 5:00 AM to July 5, 6:00 PM - The eastbound Whitemud Drive to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for reconstruction of the ramp. Traffic is advised to use 17 Street to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

June 2016

June 30 (weather permitting) - The southbound Anthony Henday Drive to westbound Yellowhead Trail traffic will be placed on a new alignment. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic will turn left at the traffic intersection at this interchange on to the northbound Anthony Henday Drive to westbound Yellowhead Trail ramp. Detour signage will be in place to direct commuters.

June 30, 6:00 AM to 9:00 AM - The eastbound Sherwood Park Freeway to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to prepare for paving for the Northeast Anthony Henday Drive Project. Traffic is advise to use 17 Street NW to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

June 29, 10:00 PM - The new southbound Anthony Henday Drive at Sherwood Park Freeway will be open.

June 29, 9:00 AM to 3:00 PM - The eastbound Sherwood Park Freeway to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to prepare for paving for the Northeast Anthony Henday Drive Project. Traffic is advise to use 17 Street NW to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

June 29 (weather permitting) - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be open.

June 29 - A new right-in/right-out access will be built from the southbound Anthony Henday Drive to Meridian Street. This access is further south than the existing access to/ from Meridian Street.

June 28, 11:00 PM to 2:00 AM - The northbound Anthony Henday Drive will be closed at the Yellowhead Trail Interchange. This traffic impact is required for coping for the Northeast Anthony Henday Drive Project. Traffic is advised to use the Lloydminster exit off northbound Anthony Henday Drive to access eastbound Yellowhead Trail, and then use the Sherwood Drive exit to access westbound Yellowhead Trail. Traffic can then use the westbound Yellowhead Trail to northbound Anthony Henday Drive ramp to head northbound on Anthony Henday Drive. Detour signage will be in place to direct commuters.

June 27, 9:00 AM to 3:00 PM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required for slope protection of bridges as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

June 21, 6:00 PM to June 22, 5:00 AM - The northbound/southbound 34 Street to eastbound Sherwood Park Freeway ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Commuters will be detoured to the 17 Street Interchange to head eastbound on Sherwood Park Freeway. Detour signage will be in place to direct commuters.

June 19 to July 20, 6:00 AM - The southbound Anthony Henday Drive to eastbound Whitemud Drive ramp and the westbound Whitemud Drive to southbound Anthony Henday Drive ramp will be closed. At this time, the west CD road will also be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use Sherwood Park Freeway and 17 Street as a detour. Detour signage will be in place to direct commuters.

June 17, 7:00 PM - The existing southbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Traffic is advised to use Baseline Road and 17 Street NW to access westbound Yellowhead Trail. Once the westbound Yellowhead Trail to southbound Anthony Henday Drive ramp is open, westbound traffic will be placed on a new alignment. Traffic will be redirected to the northbound Anthony Henday Drive to westbound Yellowhead Trail ramp. Detour signage will be in place to direct commuters.

June 18, 10:00 PM to June 19, 2:00 AM - The southbound Anthony Henday Drive to westbound Baseline Road ramp will be closed. This traffic impact is required for an overhead sign installation for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 17 Street/ Hayter Road exit off westbound Yellowhead Trail to access southbound 17 Street to Baseline Road. Traffic can also use eastbound Yellowhead Trail to southbound Broadmoor Boulevard to access Baseline Road. Detour signage will be in place to direct commuters.

June 14, 7:00 PM to June 15, 5:00 AM - The southbound Anthony Henday Drive will be closed at the Yellowhead Trail Interchange. At this time, the southbound Anthony Henday Drive to westbound Yellowhead Trail ramp will also be closed. This traffic impact is required for a concrete pour for the Northeast Anthony Henday Drive Project. Southbound traffic will be detoured to 17 Street and Baseline Road. Westbound traffic will be redirected to the northbound Anthony Henday Drive to westbound Yellowhead Trail ramp. Detour signage will be in place to direct commuters.

June 12, 12:00 AM to August 8, 5:00 AM - The southbound Anthony Henday Drive to eastbound Wye Road loop ramp and the westbound Sherwood Park Freeway to southbound Anthony Henday Drive loop ramp will be closed. This traffic impact is allowed for construction as part of the Northeast Anthony Henday Drive Project. Southbound traffic will be detoured to 17 Street. Eastbound traffic will be detoured to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

June 7, 10:00 PM to June 8, 3:00 AM - Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly bridge). This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.

June 6, 8 & 9 (nightly) - The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed. This traffic impact is required to allow for girder sandblasting for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 116 Ave exit off Yellowhead Trail to access 17 Street NE / Hayter Road. Detour signage will be in place to direct commuters.


June 3 (weather permitting) - The temporary access to southbound Anthony Henday Drive from 116 Avenue will be permanently closed. 17 Street NW or Broadmoor Drive are alternative routes to access Southbound Anthony Henday Drive.

June 2, 7:00 PM to June 3, 5:30 AM-
The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed. This traffic impact is required to allow for girder sandblasting for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 116 Ave exit off Yellowhead Trail to access 17 Street NE / Hayter Road. Detour signage will be in place to direct commuters..

June 1 to June 13 - The eastbound Yellowhead Trail to southbound Broadmoor Boulevard ramp will be closed. This traffic impact is required for paving for the Northeast Anthony Henday Drive Project. Traffic will be detoured to Sherwood Drive and then Lakeland Drive, which will provide all directional access to Broadmoor Boulevard. As this detour is a restricted truck route, trucks are advised to use 17 Street NW and Petroleum Way to access Broadmoor Boulevard. Detour signage will be in place to direct commuters.

May 2016

May 31 (weather permitting) - The southbound Anthony Henday Drive to eastbound Baseline Road turn will be opened. Also at this time, the westbound Baseline Road to southbound Anthony Henday Drive ramp will be opened.

May 31 to June 6 (nightly) - 17 Street will be closed at Sherwood Park Freeway. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Commuters are advised to use 34 Street instead. Detour signage will be in place to direct commuters.

May 31 and June 1 (nightly) - The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed. This traffic impact is required to allow for girder sandblasting for the Northeast Anthony Henday Drive Project. Traffic is advised to use the 116 Ave exit off Yellowhead Trail to access 17 Street NE / Hayter Road. Detour signage will be in place to direct commuters.


May 31 and June 1 (nightly) - Whitemud Drive will be reduced to one lane of traffic in each direction at the Anthony Henday Drive Interchange. This traffic impact is required for culvert installations for the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.


May 28, 1:00 AM to 5:00 AM - Whitemud Drive will be reduced to one lane of traffic in each direction at the Anthony Henday Drive Interchange. This traffic impact is required for an overhead sign installation for the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.

May 27, 10:00 PM to May 28, 5:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This closure is required for a concrete pour for the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road interchange. Detour signage will be in place to direct commuters.

May 25 to May 30 (nightly) - Sherwood Park Freeway will be closed at 17 Street. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Commuters are advised to use 34 Street to access Sherwood Park Freeway. Detour signage will be in place to direct commuters.

May 25, 6:00 PM to May 26, 12:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This closure is required for a concrete pour for the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road interchange. Detour signage will be in place to direct commuters.

May 24, 10:00 PM to May 25, 5:00 AM - Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly bridge). Only the left lane will be open. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.

May 18, 6:00 PM to May 19, 12:00 AM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This closure is required for a concrete pour for the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road interchange. Detour signage will be in place to direct commuters.

May 17, 8:00 PM to May 18, 5:00 AM - Northbound and southbound Anthony Henday Drive over Yellowhead Trail on the east side of Edmonton will be closed. This traffic impact is required to allow for a deck pour for the Northeast Anthony Henday Drive Project. Detour signage and VMS boards will be in place to direct commuters. The following traffic movements will be impacted:

May 17, 11:00 AM to 7:00 PM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. This traffic impact is required for a culvert installation for the Northeast Anthony Henday Drive Project. Commuters will be detoured westbound to the 17 Street interchange. Detour signage will be in place to direct commuters.

May 15, 6:00 AM to May 16, 5:00 AM - 34 Street over Sherwood Park Freeway will be closed. The northbound/ southbound 34 Street to eastbound/ westbound Sherwood Park Freeway ramps will also be closed. Commuters are advised to use 17 Street instead. This traffic impact is required to allow for guardrail and sign installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

May 15, 7:00 PM to May 23, 5:00 AM - Eastbound Whitemud Drive will be reduced to one lane of traffic at the Anthony Henday Drive interchange. This traffic impact is allowed for milling and paving for the Northeast Anthony Henday Drive Project. Upon completion of the milling and paving on eastbound Whitemud Drive, westbound Whitemud Drive will be reduced to one lane. Commuters are to be advised of this major delay and to take alternate routes.

May 14 and 15 (nightly) - Westbound Yellowhead Trail will be closed under the Anthony Henday Drive interchange. The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will also be closed. Traffic will have to take the Lloydminster exit off northbound Anthony Henday Drive and head to Sherwood Drive to access westbound Yellowhead Trail. Westbound traffic will be redirected to the temporary westbound Yellowhead Trail to southbound Anthony Henday Drive ramp to head westbound or southbound at the new traffic intersection. Northbound Anthony Henday will be closed north of the Lloydminster exit. This traffic impact is allowed for bridge work as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

May 14, 7:00 AM to 12:00 PM - Northbound Anthony Henday Drive at the Whitemud Drive Interchange will be reduced to one lane of traffic onto the CD road; after the Whitemud Interchange, Northbound Anthony Henday Drive will operate as normal. This traffic impact is required for a sign installation for the Northeast Anthony Henday Drive Project. Signage will be in place to direct commuters.

May 13 and 14 (daily) - The northbound Manning Drive to westbound Anthony Henday Drive ramp will be closed. Traffic is advised to head westbound on 167 Avenue and use 66 Street to access westbound Anthony Henday Drive. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

May 10 and 11 (daily) - The southbound Anthony Henday Drive to westbound Baseline Road ramp will be closed. Traffic is advised to take the westbound Yellowhead Trail exit off southbound Anthony Henday Drive, and then use the 17 Street/ Hayter Road exit to access southbound 17 Street to Baseline Road. This traffic impact is required for construction for the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

May 6, 2:00 AM to 6:00 AM - Petroleum Way will be reduced to a single alternating lane of traffic to the east of the Suncor/ Air Products entrance until Strathmoor Way. This traffic impact is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project.

May 2, 5:00 AM to June 17, 8:00 PM - The southbound Anthony Henday Drive to westbound Whitemud Drive directional ramp will be closed. Traffic will be able to head westbound using the other loop ramps at this interchange. This traffic impact is required for construction as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters. Please click the link below for a map of the detour.

Southbound Anthony Henday Drive to Westbound Whitemud Drive Detour

May 1, 6:00 AM to 10:00 PM - 34 Street over Sherwood Park Freeway will be closed. The northbound/ southbound 34 Street to eastbound/ westbound Sherwood Park Freeway ramps will also be closed. Commuters are advised to use 17 Street instead. This traffic impact is required to allow for paving as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 2016

April 30, 7:00 PM to May 1, 12:00 PM - Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly bridge). The Hayter Road to Westbound Yellowhead Trail ramp will also be closed. This traffic impact is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this significant delay, and to plan their route accordingly. A detour will be provided through the Highway 21 Interchange and the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

April 30, 7:00 AM to 2:00 PM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. This traffic impact is required for construction as part of the Northeast Anthony Henday Project. Commuters will be detoured westbound to the 17 Street interchange. Detour signage will be in place to direct commuters.

April 30, 2:00 AM to 6:00 AM - Eastbound Yellowhead Trail will be closed near the Anthony Henday Drive interchange. A detour route will be available to eastbound commuters by heading southbound on Anthony Henday Drive, and exiting onto Baseline Road. Northbound commuters will be advised to exit off at Baseline Road. This traffic impact is required to allow for an overhead sign installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 23, 2:00 AM to 6:00 AM - Eastbound Yellowhead Trail will be closed near the Anthony Henday Drive interchange. A detour route will be available to eastbound commuters by heading southbound on Anthony Henday Drive, and exiting onto Baseline Road. Northbound commuters will be advised to exit off at Baseline Road. This traffic impact is required to allow for an overhead sign installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 22, 7:00 AM to April 25, 3:00 PM - Eastbound Sherwood Park Freeway will be closed at 34 Street. The 34 Street bridge over Sherwood Park Freeway will also be closed. Traffic on eastbound Sherwood Park Freeway and northbound 34 Street will be detoured to 17 Street via the 34 Street to eastbound Sherwood Park Freeway ramp. Southbound traffic on 34 Street will be detoured to 50 Street via the 34 Street to westbound Sherwood Park Freeway ramp. This closure is required for construction as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 20 to May 18 (nightly) - The northbound Anthony Henday will be reduced to one lane south of the Anthony Henday Drive and Sherwood Park Freeway/ Wye Road interchange. There will be short stoppages at the northbound Anthony Henday Drive to westbound Sherwood Park Freeway and eastbound Wye Road loop ramps. Commuters will be detoured to Baseline Road. This traffic impact is required for construction as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 20 and 21 (daily) - Petroleum Way will be reduced to a single alternating lane of traffic to the east of the Suncor/ Air Products entrance until Strathmoor Way. This traffic impact is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project.

April 17, 5:00 PM to July 12- The westbound Yellowhead Trail to southbound Anthony Henday Drive loop ramp will be closed. Traffic will continue westbound on the Yellowhead Trail and use the new ramp prior to the Meridian Street bridge. A new traffic light will be installed at this intersection. Signage will be in place to direct commuters.

April 17, 3:00 AM to 3:00 PM - Petroleum Way will be closed under Anthony Henday Drive. These closures are required to allow for concrete pours as part of the Northeast Anthony Henday Drive Project. There will be a hard closure at this location, to allow for safe construction practices. Traffic will be detoured via 17 Street to access Baseline Road or Yellowhead Trail. Detour signage will be in place to direct commuters.

April 15, 8:00 PM to April 17, 6:00 PM - Westbound Yellowhead Trail will be reduced to one lane of traffic to the east of the Yellowhead Trail and Anthony Henday Drive interchange. The Hayter Road to Westbound Yellowhead Trail ramp will also be closed. This traffic impact is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this significant delay, and to plan their route accordingly. A detour will be provided through the Highway 21 Interchange and the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

April 15, 9:00 AM to April 18, 5:00 AM - The 34 Street Bridge over Sherwood Park Freeway will be closed. Traffic on westbound Sherwood Park Freeway exiting southbound on 34 Street and southbound traffic on 34 Street will be detoured to 50 Street via the 34 Street to westbound Sherwood Park Freeway ramp. Traffic on eastbound Sherwood Park Freeway exiting northbound on 34 Street and northbound traffic on 34 Street will be detoured to 17 Street via the 34 Street to easbound Sherwood Park Freeway ramp. This closure is required for construction as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 13, 14 and 16 (nightly) - The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed. This traffic impact is required to allow for bridge work activities for the Northeast Anthony Henday Drive Project. Traffic will be advised to use the 116 Avenue exit off Yellowhead Trail to access 17 Street NE/ Hayter Road. Detour signage will be in place to direct commuters.

April 12, 10:00 AM to June 13- Broadmoor Boulevard will be reduced to one lane of traffic in each direction between Pembina Road and Highway 16. Southbound traffic will not be able to turn left on to Pembina Road and will have to turn right on to Strathmoor Way to get to Strathmoor Drive, turn right on Strathmoor Drive and then head eastbound to Pembina Road. Northbound traffic exiting Pembina Road cannot turn right onto Broadmoor Boulevard to access the Yellowhead Trail, and is advised to use Sherwood Drive instead. The speed limit will be reduced to 50 km/hr. Travelers are to be advised of this change and plan their route accordingly. Detour signs and VMS boards will be in place to direct commuters.

April 9, 5:00 AM to 6:00 PM, April 10 - Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly Bridge). Only the right lane will be open. The Hayter Road to Westbound Yellowhead Trail ramp will also be closed. This traffic impact is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this significant delay, and to plan their route accordingly. A detour will be provided through the Highway 21 Interchange, the Sherwood Drive Interchange, and via traveling southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

April 9, 1:00 AM to 5:00 AM - Eastbound Yellowhead Trail will be closed near the Anthony Henday Drive interchange. A detour route will be available to eastbound commuters by heading southbound on Anthony Henday Drive, and exiting onto Baseline Road. Northbound commuters will be advised to exit off at Baseline Road. This traffic impact is required to allow for an overhead sign installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 8, 9:00 PM - Eastbound Baseline Road will be closed for a 30 minute closure, east of the 17 Street Interchange. A detour will be available via the 17 Street Interchange. This traffic impact is required to install an overhead sign as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 8, 9:00 AM to 3:00 PM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at the Hayter Road / 17 Street exit off westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

April 8, 1:00 AM to 5:00 AM - The eastbound Sherwood Park Freeway to northbound / southbound 34 Street ramp will be closed. This traffic impact is required to remove an island as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to utilize the 50 Street Interchange. Detour signage will be in place to direct commuters.

April 7, 8:00 PM to April 8, 1:00 AM - The westbound Sherwood Park Freeway to northbound / southbound 34 Street ramp will be closed. This traffic impact is required to remove an island as part of the Northest Anthony Henday Drive Project. Commuters will be advised to utilize the 17 Street Interchange. Detour signage will be in place to direct commuters.

April 7, 10:00 AM to 3:00 PM - Petroleum Way will be closed under Anthony Henday Drive. These closures are required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. There will be a hard closure at this location, to allow for safe construction practices. Traffic will be detoured via 17 Street to access Baseline Road or Yellowhead Trail. Detour signage will be in place to direct commuters.

April 6 to June 4 - Eastbound Yellowhead Trail will be reduced to two lanes at the Beverly bridge to allow for the new road alignment to be constructed. The right lane will be closed and traffic will merge left into the center lane on the bridge. Commuters are to be advised of this delay, and to plan their route accordingly. VMS boards will be in place to direct commuters.

April 4, 9:00 AM to 3:00 PM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for overhead sign installation as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at the Hayter Road / 17 Street exit off westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

April 3, 8:00 AM to 5:00 PM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This closure is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road interchange. Detour signage will be in place to direct commuters.

April 2, 5:00 AM to 6:00 PM, April 3 - The eastbound Whitemud Drive to northbound Anthony Henday Drive directional ramp and the northbound Anthony Henday Drive to westbound Whitemud Drive loop ramp will be closed. Eastbound commuters will be advised to detour via 17 Street. Westbound commuters will be detoured northbound on Anthony Henday Drive to access Sherwood Park Freeway / Wye Road Interchange. These closures are required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 2, 5:00 AM to 6:00 PM, April 3 - The westbound Sherwood Park Freeway/Wye Road to southbound Anthony Henday Drive loop ramp will be closed. This traffic impact is required for the Northeast Anthony Henday Project. Commuters will be detoured westbound to the 17 Street interchange. Detour signage will be in place to direct commuters.

April 1 to April 4 (nightly) - Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly Bridge). This traffic impact is required to allow for bridge repair by CN Rail. Access from Hayter Road to westbound Yellowhead Trail will also be closed. Commuters are to be advised of this significant delay, and to plan their route accordingly. A detour will be provided through the Highway 21 Interchange, the Sherwood Drive Interchange, and via traveling southbound Anthony Henday Drive. Detour signage will be in place to direct commuters. The closure times are as follows:

March 2016

March 19, 10:00 PM to 2:00 AM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. Also at this time, the right lane will be closed on Wye Road, after the ramp closure, over Anthony Henday Drive. This traffic impact is required to allow for an overhead sign installation for the Northeast Anthony Henday Project. Commuters will be detoured westbound to the 17 Street interchange. Detour signage will be in place to direct commuters.

March 19, 5:00 AM to 6:00 PM, March 20 - Southbound and northbound Anthony Henday Drive at Whitemud interchange will be reduced to one lane of traffic, and crossed over to the northbound lanes via a median crossover. This closure is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

March 15, 9:00 PM to 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required for a concrete pour as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at the Hayter Road / 17 Street exit off westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

March 15, 9:00 AM to 12:00 PM - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This closure is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

March 12, 5:00 AM to 6:00 PM, March 13- Southbound and northbound Anthony Henday Drive at Whitemud interchange will be reduced to one lane of traffic, and crossed over to the southbound lanes via a median crossover. This closure is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

March 9, 9:00 AM to 3:00 PM - The westbound Sherwood Park Freeway to northbound / southbound 34 Street ramp will be closed. This traffic impact is required to allow for a light pole installation as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to utilize the 17 Street Interchange. Detour signage will be in place to direct commuters.

March 8, 9:00 AM to 3:00 PM - The northbound/southbound 34 Street to eastbound Sherwood Park Freeway ramp will be closed. This traffic impact is required to allow for a light pole installations as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured to the 17 Street Interchange. Detour signage will be in place to direct commuters.

March 7, 9:00 AM to 3:00 PM - The northbound Anthony Henday Drive to eastbound Township Rd 522 ramp and the northbound Anthony Henday Drive to westbound Whitemud Drive loop ramp will be closed. Commuters will be detoured northbound to the Sherwood Park Freeway / Wye Road Interchange. This traffic impact is required to allow for an overhead sign installation for the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

March 5, 5:00 AM to 6:00 PM, March 6- Southbound Anthony Henday Drive at Whitemud Interchange will be reduced to one lane of traffic onto the CD road. Also at this time, the westbound Whitemud Drive to southbound Anthony Henday Drive loop ramp will be closed; drivers will be advised to use the 17 Street Interchange. This closure is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

March 4, 9:00 AM to 3:00 PM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. Also at this time, the right lane will be closed on Wye Road, after the ramp clousre, over Anthony Henday Drive. This traffic impact is required to allow for a overhead sign installation for the Northeast Anthony Henday Project. Commuters will be detoured westbound to the 17 Street Interchange. Detour signage will be in place to direct commuters.

February 2016

February 29, 9:00PM to 5:00AM, March 1 - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed in order to drive piles for a new bridge pier as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at 17 Street and Baseline Road.

February 27 & 28 (daily) - Petroleum Way will be closed under Anthony Henday Drive. These closures are required to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. There will be a hard closure at this location, to allow for safe construction practices. Traffic will be detoured via 17 Street to access Baseline Road or Yellowhead Trail. Detour signage will be in place to direct commuters. The closure times are as follows:

February 27, 5:00 AM to 6:00 PM, February 28 - Northbound Anthony Henday Drive at Whitemud interchange will be reduced to one lane of traffic onto the CD road; after the Whitemud interchange, Northbound Anthony Henday Drive will operate as normal. The eastbound Whitemud Drive to northbound Anthony Henday Drive loop ramp will be closed; drivers will be advised to use 17 Street interchanges. The westbound Whitemud Drive to northbound Anthony Henday ramp will be closed; commuters will be detoured further west to the 17 Street interchange. This closure is required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

February 26, 9:00 AM to 3:00 PM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. Westbound commuters will be advised to use 17 street interchange for an alternate route. This closure is required to perform bridge work.

February 25 to 27 (nightly) - Westbound Wye Road will be closed overnight on Thursday and Friday after the ramp to northbound Anthony Henday Drive. Drivers will be redirected to Baseline Road. Eastbound Sherwood Park Freeway will be closed after the ramp to southbound Anthony Henday Drive. Drivers will be redirected to Whitemud Drive. The exit to eastbound Wye Road will also be closed from southbound Anthony Henday Drive. Drivers will be redirected to Whitemud Drive. Driver on eastbound Sherwood Park Freeway will not have access to northbound Anthony Henday Drive and will need to use 17 Street. These closures are required to perform bridge work safely over Wye Road. The closure times are as follows:

February 25, 9:00 AM to 3:00 PM - The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed. Westbound commuters will be advised to use 17 Street interchange for an alternate route. This closure is required to perform bridge work.

February 24, 3:00 PM - Northbound Anthony Henday Drive traffic traveling under the Sherwood Park Freeway / Wye Road Interchange will be switched back onto the new northbound lanes in the area.

February 21, 7:00 AM to 6:00 PM - The eastbound Whitemud Drive to southbound Anthony Henday Drive directional ramp, and the westbound Whitemud Drive to southbound Anthony Henday loop ramp will be closed. Eastbound commuters will be advised to exit prior to the Whitemud Drive Interchange via 17 Street. Westbound commuters will be detoured further west to the 17 Street Interchange. These closures are required to allow for culvert installations as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

February 20, 5:00 AM to 7:00 AM, February 21 - Petroleum Way will be closed under Anthony Henday Drive. This closure is required to allow for the road to be repaired. Traffic will be detoured via 17 Street to access Baseline Road or Yellowhead Trail. Detour signage will be in place to direct commuters.

February 19, 10:00 PM to 5:00 AM - Westbound Sherwood Park Freeway will be closed, west of Anthony Henday Drive. At this time the westbound Sherwood Park Freeway to 17 Street ramp will be closed. This traffic impact is required to allow for a overhead sign installation as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour via Anthony Henday Drive.

February 19 & 22- Westbound Baseline Road will be reduced to one lane of traffic, east of the Anthony Henday Interchange. This traffic impact is required for a sign instillation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters. The closure times are as follows;

February 19 & 20 (daily) - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required for bridge work activities for the Northeast Anthony Henday Drive Project. Traffic will be detoured northbound on Anthony Henday Drive to access the Baseline Road interchange. Detour signage will be in place to direct commuters. The closure times are as follows:

February 18, 2:00 AM to 5:00 AM - The westbound Baseline Road to northbound Anthony Henday drive ramp will be closed. This traffic impact is required to allow for bridge work as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured westbound on Baseline Road to access 17 Street. Detour signage will be in place to direct commuters.

February 18, 11:00 PM to 5:00 AM - The eastbound Sherwood Park Freeway to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for a overhead sign installation as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at 17 Street and Sherwood Park Freeway.

February 17, 10:00 PM to 5:00 AM - Eastbound Sherwood Park Freeway will be closed, east of 17 Street. This traffic impact is required to allow for a overhead sign instillation as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to detour at 17 Street and Sherwood Park Freeway.

February 17, 10:00 PM to 12:00 AM - Full closure of 17 Street northbound over Sherwood Park Freeway. This traffic impact is required to allow for a overhead sign instillation as part of the Northeast Anthony Henday Project. Commuters will be advised to detour at 76 Avenue to 34 Street and Sherwood Park Freeway.

February 11, 12:00 AM to 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for bridge work as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to Hayter Road / 17 Street exit to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

February 10 - Northbound Anthony Henday Drive traffic traveling under the Sherwood Park Freeway / Wye Road Interchange, will be switched onto the old northbound lanes in the area. This traffic impact is required to allow for bridge work as part of the Sherwood Park Freeway /  Wye Road Interchange. This traffic pattern will remain in place for approximately one week.

February 8, 9:00 AM to 6:00 PM, February 9 - The northbound Anthony Henday Drive to eastbound Township Road 522 directional ramp will be closed. This closure is required to install culverts as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound on Anthony Henday Drive to access the Sherwood Park Freeway / Wye Road Interchange. Detour signage will be in place to direct commuters.

February 7, 6:00 AM to 5:00 PM - The southbound Anthony Henday Drive to westbound Whitemud Drive directional ramp will be closed. This traffic impact is required to allow for a culvert installation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured southbound on Anthony Henday Drive to the 17 Street NW exit. Detour signage will be in place to direct commuters.

February 6, 5:00 AM to 5:00 PM - Eastbound Whitemud Drive will have the left lane closed over the Anthony Henday Drive Interchange. This closure is required to allow for a culvert installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

February 5 & 6, 8:00 PM to 8:00 AM (nightly) - Southbound Anthony Henday Drive will be closed under the Sherwood Park Freeway / Wye Road Interchange. This traffic impact is required to allow for construction work for the bridge in the Sherwood Park Freeway / Wye Road Interchange. Traffic will be detoured to the southbound Henday to westbound Sherwood Park Freeway directional ramp, to access 17 Street Interchange, to access eastbound Sherwood Park Freeway, to access the eastbound to southbound Anthony Henday ramp. Detour signage will be in place to direct commuters.

February 4, 7:00 AM to 5:00 PM - The westbound Whitemud Drive to southbound Anthony Henday Drive loop ramp will be closed. This traffic impact is required to install culverts as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured westbound on Whitemud Drive to the 17 Street Interchange. Detour signage will be in place to direct commuters.

February 3 & 4, 9:00 PM to 5:00 AM (nightly) - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for a bridge work as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Hayter Road / 17 Street NW exit to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

February 3, 8:00 PM to 5:00 AM - Westbound Sherwood Park Freeway will be rerouted around the 17 Street Interchange. This traffic impact is required to allow for a concrete pour for the new 17 Street Bridge for the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street exit ramp to cross 17 Street to continue on westbound Sherwood Park Freeway. Detour signage will be in place to direct commuters.

February 2 & 3, 9:00 AM to 3:00 PM (daily) - The northbound Anthony Henday Drive to westbound Whitemud Drive loop ramp will be closed. Also at this time, westbound Whitemud Drive will be reduced to one lane of traffic. This closure is required to allow for a culvert installation as part of the Northeast Anthony Henday Drive Project. Commuters will be detoured northbound on Anthony Henday Drive to access Sherwood Park Freeway / Wye Road Interchange. Detour signage will be in place to direct commuters.

January 2016

January 31, 5:00 AM to 6:00 PM - The northbound Anthony Henday Drive to westbound Whitemud Drive loop ramp will be closed. Commuters will be detoured northbound on Anthony Henday Drive to access the Sherwood Park Freeway / Wye Road Interchange. Also at this time, the eastbound Township Road 522 to northbound Anthony Henday Drive loop ramp will be closed. Commuters will be detoured eastbound to Range Rd 233 to access Wye Rd. These closures are required to install culverts as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

January 30, 4:00 AM to 7:00 PM, February 1 - The access from Meridian Street (south of Sherwood Park Freeway / Wye Road Interchange) to southbound Anthony Henday Drive, will be closed. This traffic impact is required to allow for sign installation activities as part of the Northeast Anthony Project. Traffic will be detoured to 17 Street to access eastbound Sherwood Park Freeway, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

January 30, 5:00 AM to 6:00 PM - The following directions will be closed in the Whitemud Drive and Anthony Henday Drive Interchange. These closures are required to install culverts as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

January 27-29 (daily) - The southbound Anthony Henday Drive to eastbound Township Rd 522 loop ramp will be closed. Commuters will be detoured south on the Anthony Henday to the Highway 14 exit. Also at this time, the westbound Whitemud Drive to southbound Anthony Henday Drive loop ramp will be closed. Commuters will be detoured westbound on Whitemud Drive to the 17 Street Interchange. These closures are required to install culvert as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters. The closure times are as follows;

January 26, 8:00 PM to 5:00 AM, January 27 - Eastbound and westbound Yellowhead Trail will be reduced to one lane of traffic in each direction, around the Meridian Street/ Anthony Henday Interchange, with both directions of traffic on the existing eastbound Yellowhead Trail. This traffic impact is required to allow for bridge work activities on the Yellowhead Trail and Anthony Henday Drive Interchange. Detour signage will be in place to direct commuters.

January 26, 1:00 AM to 5:00 AM - The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed. This traffic impact is required to allow for construction activities as part of the Northeast Anthony Henday Drive Project. A detour route will be available by heading northbound on Anthony Henday Drive, and exiting onto Yellowhead Trail westbound to 17 Street/ 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

January 22 to 25 (nightly) - Southbound Anthony Henday Drive will be closed under the Sherwood Park Freeway / Wye Road Interchange. This traffic impact is required to allow for girders to be erected for a new bridge in the Sherwood Park Freeway / Wye Road Interchange. Traffic will be detoured to the southbound Anthony Henday to westbound Sherwood Park Freeway directional ramp, to access the 17 Street Interchange, to access eastbound Sherwood Park Freeway to access the eastbound to southbound Anthony Henday ramp. Detour signage will be in place to direct commuters. The closure times are as follows;

January 22 & 23, 7:00 PM to 6:00 AM (nightly) - The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed. This traffic impact is required to allow for bridge work activities for the Northeast Anthony Henday Drive Project. Traffic will be advised to use the 116 Ave exit off Yellowhead Trail to access 17 Street NE / Hayter Road. Detour signage will be in place to direct commuters.

January 21 - Northbound Anthony Henday Drive traffic traveling under the Sherwood Park Freeway / Wye Road Interchange, will be switched back onto the new northbound lanes in the area. This traffic impact is required to allow for girder erection as part of the Sherwood Park Freeway / Wye Road Interchange.

January 18, 7:00 AM to 5:00 PM - The westbound Whitemud Drive / Township Rd 522 to northbound Anthony Henday Drive directional ramp will be closed. This traffic impact is required as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the three existing loop ramps at the Whitemud Drive Interchange, to access northbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

January 13 to 15, 9:00 AM to 3:00 PM (daily) - The northbound Anthony Henday Drive to westbound Sherwood Park Freeway ramp will be closed. This traffic impact is required to allow for a girder erection as part of the Northeast Anthony Henday Project in Edmonton. Traffic will be detoured northbound to the Baseline Road Interchange. Detour signage will be in place to direct commuters.

January 13 - Northbound Anthony Henday Drive traffic traveling under the Sherwood Park Freeway / Wye Road Interchange, will be switched onto the old northbound lanes in the area. This traffic impact is required to allow for a girder erection as part of the Sherwood Park Freeway / Wye Road Interchange. This traffic pattern will remain in place for approximately one week.

January 8, 2:30 AM to 5:00 AM - The Northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed. This traffic impact is required to allow for construction activities as part of the Northeast Anthony Henday Drive Project. A detour route will be available by heading northbound on Anthony Henday Drive, and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 2015

November 25, 9:00 AM to 3:00 PM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Hayter Road / 17 Street NW exit to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

November 19, 9:00 AM to 3:00 PM - The southbound Anthony Henday Drive  to eastbound Sherwood Park Freeway loop ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured westbound on Sherwood Park Freeway, to the 17 Street Interchange. Detour signage will be in place to direct commuters

November 14 - Sherwood Park Freeway / 17 Street Interchange - 17 Street will be reopened with northbound and southbound traffic moved onto the new northbound 17 Street Bridge. All four directional ramps will be opened, and the 76 Avenue temporary connection will be removed. This stage will then remain in place for the remainder of the project until the new southbound bridge is opened.

November 14- Baseline Road construction will have the new eastbound and westbound lanes complete, in order to provide a straight alignment on this section of the road. At this time, the eastbound Baseline Road to southbound Anthony Henday Drive ramp will be opened. The opening of this new ramp will pull the turning movement traffic out of the eastbound through lanes and provide added capacity for eastbound traffic. At this time the new westbound Baseline Road to northbound Anthony Henday Drive ramp will be opened to commuters.

November 9, 8:00 PM to 5:00 AM, November 10- The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. Also, at this time the northbound and southbound Meridian Street (Henday) access, over Yellowhead Trail, will be closed. This traffic is required to allow for bridge work as part of the Northeast Anthony Henday Project. Commuters will be advised to exit onto Baseline Road to access northbound 17 Street NW, to access westbound Yellowhead Trail. Traffic will also be detoured to eastbound Yellowhead Trial to access the Sherwood Drive Interchange, to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 6, 8:00 PM to 7:00 AM, November 7- The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. This traffic impact is required to allow for bridge work as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to exit onto Baseline Road to access northbound 17 Street NW, to access westbound Yellowhead Trail. Traffic will also be detoured onto northbound Meridian Street to access Hayter Road, to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 6, 8:00 PM to November 9, 5:00 AM - Petroleum Way will be closed (underneath Anthony Henday Drive) to allow for the remaining Bridge culvert to be demolished as part of the Northeast Anthony Henday Drive Project. There will be a hard closure at this location, to allow for safe construction practices. Traffic will detour via Baseline Road and 17 Street. Detour signage will be in place to direct commuters.

November 6, 11:00 AM to 1 :00 PM- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for paving for the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Hayter Road/ 17 NW exit to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

November 6, 9:00 AM to November 10, 9:00 PM- The northbound Anthony Henday Drive to westbound Sherwood Park Freeway loop ramp will be  closed. This traffic impact is required to allow for Sherwood Park Freeway to be put on the new alignment over Anthony Henday Drive. Traffic will be detoured through the Whitemud Drive Interchange or the Baseline Road Interchange. Detour signage will be in place to direct commuters.

October 2015

October 31, 9:00 AM to 3:00 PM - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow for girder work as part of the Northeast Anthony Henday Drive Project. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

October 31, 9:00 AM to 3:00 PM- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Victoria Trail exit off Yellowhead Trail to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

October 30, 8:00 PM to 5:00 AM, November 2 - The eastbound Yellowhead Trail access to 116 Ave (17 Street NW/ Hayter Road) exit will be closed. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project in Edmonton. A detour route will be available by using the eastbound Yellowhead Trail to northbound Meridian Street (Henday) loop ramp. Commuters can then continue north to the Waste Management Center, or use Hayter Road to access westbound Yellowhead Trail. Detour signage will be in place do direct commuters.

October 30, 8:00 PM to 5:00 AM, November 2 - Eastbound Yellowhead Trail (east of Beverly Bridge will be reduced to 2 lanes of traffic. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this delay, and to take alternate routes.

October 27 & 28- 8:00 PM to 5:00 AM (each night) - The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. This traffic impact is required to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to exit onto Baseline Road to access northbound 17 Street NW, to access westbound Yellowhead Trail. Traffic will also be detoured onto northbound Meridian Street to access Hayter Road, to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 26, 8:00 PM- Westbound traffic on Yellowhead Trail will be put on the new alignment, over the new bridges, between Sherwood Drive and Beverly Bridge. Commuters are to be advised of this new traffic pattern.

October 26, 9:00 AM to 5:00 AM, October 27 - The 28 Street NE turn movement onto westbound Yellowhead Trail will be closed. This traffic impact is required to allow for the realignment of westbound Yellowhead Trail. A detour will be available through the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

October 24, 8:00 PM to October 26, 5:00 AM - Eastbound Yellowhead Trail (east of Beverly Bridge) will be reduced to 1 lane of traffic. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this major delay, and to take alternate routes.

October 23, 9:00 AM to 5:00 AM, October 26- The southbound Anthony Henday Drive to eastbound Baseline Road turn movement will be closed. Commuters can still access westbound Baseline Road. Also, the westbound Baseline Road to southbound Anthony Henday Drive turn movement will be closed. This traffic impact is required to complete the Baseline Road Interchange as part of the Northeast Anthony Henday Drive Project. Traffic will detour to the 17 Street Interchange to access Baseline Road westbound. Detour signage will be in place to direct commuters.

October 23, 7:00 PM to October 26, 5:00 AM- The eastbound Sherwood Park Freeway to southbound Anthony Henday Drive ramp, and the southbound Anthony Henday Drive to eastbound Wye Road loop ramp will be closed. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Eastbound Traffic will be detoured to the Baseline Road Interchange. Southbound Traffic will be detoured to the Whitemud Drive Interchange. Detour signage will be in place to direct commuters.

October 23, 8:00 PM to 5:00 AM, October 26- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This Traffic impact is required to allow for a bridge demolition as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

October 21- Eastbound traffic on Yellowhead Trail will be put on the new alignment, over the new bridges, between Sherwood Drive and Beverly Bridge. At this time the new Eastbound Yellowhead Trail to northbound Anthony Henday Drive loop ramp will be opened. Commuters are to be advised of this new traffic pattern.

October 20, 7:00 PM to 5:00 AM- The eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for paving as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to exit at the 116 Ave interchange to access 17 Street NW to access Baseline Road. Traffic will also be detoured to Sherwood Drive to access westbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

October 17- Northbound and southbound traffic on Anthony Henday Drive will be put on the new alignment, over the new bridges, between Petroleum Way and Aurum Road. Commuters are to be advised of this new traffic pattern.

October 16, 17, & 18 - Eastbound Yellowhead Trail, between Broadmoor Boulevard and Clover Bar Road, will be reduced to one lane of traffic, intermittently throughout the day. These lane closures are to allow for paving activities as part of the Northeast Anthony Henday Drive Project. Commuters are to be advised of this delay, and to take alternate routes.

October 16, 7:00 PM to October 19, 5:00 AM - The eastbound Sherwood Park Freeway ramp to southbound Anthony Henday Drive will be closed. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the three remaining loop ramps at the Sherwood Park Freeway and Anthony Henday Drive Interchange. Detour signage will be in place to direct commuters.

October 13, 14 & 15 - 8:00 PM to 5:00 AM (each night)- The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. This traffic impact is required to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to exit onto Baseline Road to access northbound 17 Street NW, to access westbound Yellowhead Trail. Traffic will also be detoured onto eastbound Yellowhead Trail to access the Sherwood Drive Interchange, to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 9, 8:00 PM to 8:00 AM - The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed. This traffic impact is required to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. Commuters will be advised to exit onto Baseline Road to access northbound 17 Street NW, to access westbound Yellowhead Trail. Traffic will also be detoured onto eastbound Yellowhead Trail to access the Sherwood Drive Interchange, to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 8, 7:00 PM to 5:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

October 8, 9:00 AM to 5:00 PM, October 9 - The 28 Street NE turn movement onto westbound Yellowhead Trail will be closed. This traffic impact is to allow for a culvert installation and paving work in the area. A detour will be available through the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

October 7, 8:00 PM - Eastbound Yellowhead Trail at the 116 Ave (17 Street/Hayter Road) exit will be put on the new alignment. The exit onto 116 Ave (17 Street / Hayter Road) has been relocated east from the existing interchange. Commuters are advised to pay attention to the new traffic alignment. Detour signage will be in place to direct commuters.

October 6th - 9th (9:00 AM to 4:00 PM daily) - Westbound Yellowhead Trail will be reduced to one lane between the Broadmoor Boulevard Interchange and the Clover Bar Road Interchange. This traffic impact is required to allow for paving for the Northeast Anthony Henday Drive Project.

October 2, 8:00 PM to 5:00 AM, October 5- Wye Road / Sherwood Park Freeway (eastbound and westbound) will be closed over Anthony Henday Drive (between Ordze Road and 34 Street). Northbound and southbound Anthony Henday Drive will be rerouted around the Sherwood Park Freeway/ Wye Road Interchange. This traffic impact is required to demolish the existing eastbound Wye Road / Sherwood Park Freeway Bridge, as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.
Detour Routes are as follows:

October 2, 8:00 PM to 5:00 AM, October 5- Eastbound and westbound Sherwood Park Freeway between Ordze Road and 34 Street, will be closed. This is to allow for a culvert instillation as part of the Northeast Anthony Henday Project. Westbound commuters will be directed to use alternate routes (Sherwood Drive). Eastbound commuters will be detoured via Whitemud Drive or 34 Street. Detour signage will be in place to direct commuters.

September 2015

September 25, 9:00 AM - The eastbound Yellowhead Trail to southbound Broadmoor Boulevard ramp will be closed for approximately two weeks. This traffic impact is required to realign the roadway for the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Sherwood Drive Interchange and the Clover Bar Interchange. Detour signage will be in place to direct commuters.

September 25, 8:00 PM to 5:00 AM, September 28- Westbound Yellowhead Trail will be reduced to one lane of traffic near the 17 Street / Hayter Road exit (east of Beverly Bridge). This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Traffic can choose to detour onto 17 Street to access westbound Baseline Road / 101 Ave. Detour signage will be in place to direct commuters.

September 24, 9:00 AM to 5:00 AM, September 25 - The southbound Anthony Henday Drive ramp to westbound Sherwood Park Freeway / Wye Road will be closed. Also at this time, westbound Sherwood Park Freeway will be reduced to one lane. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured south on Anthony Henday Drive to exit westbound on Whitemud Drive. Detour signage will be in place to direct commuters.

September 23, 8:00 PM to 5:00 AM, September 24 - Hayter Road will be closed at the CN Rail crossing in the area (south of the tracks). This traffic impact is required for a concrete pour for a new bridge crossing the CN Rail in the area. Emergency vehicles will maintain access if required. A detour will be available by heading north at the Sherwood Drive and Yellowhead Trail Interchange, left on 121 Ave, right on 17 Street NE, left on 127 Ave, to Aurum Road. Detour signage will be in place to direct commuters.

September 21, 9:00 AM to 3:00 PM - The eastbound Yellowhead Trail to southbound Broadmoor Boulevard ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Sherwood Drive Interchange and Clover Bar Interchange. Detour signage will be in place to direct commuters.

September 20, 7:00 AM to 5:00 AM, September 21 - The 28 Street exit (north of Yellowhead Trail) onto westbound Yellowhead Trail, will be closed. This traffic impact is required to allow for paving in the area for the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Sherwood Drive Interchange to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

September 19, 12:00 PM to 6:00 PM - The eastbound Yellowhead Trail to southbound Broadmoor Boulevard ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Sherwood Drive Interchange and Clover Bar Interchange. Detour signage will be in place to direct commuters.

September 19, 8:00 PM to 5:00 AM, September 20 - Hayter Road will be closed at the CN Rail Crossing in the area (south of the tracks). This traffic impact is required for a concrete pour for a new bridge crossing the CN Rail in the area. Emergency vehicles will maintain access if required. A detour route will be available by heading north at the Sherwood Drive and Yellowhead Trail Interchange, left on 121 Ave, right on 17 Street NE, left on 127 Ave to Aurum Road. Detour signage will be in place to direct commuters

September 18, 8:00 PM to 5:00 AM, September 21 - Anthony Henday Drive will be reduced to one lane of traffic in each direction at the Baseline Road Intersection (northbound and southbound). This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Traffic signage will be in place to direct commuters.

The eastbound Baseline Road directional ramp to northbound Anthony Henday Drive will be closed to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. A detour route will be available by exiting onto 17 Street northbound to access Yellowhead Trail eastbound and westbound. Detour signage will be in place to direct commuters. The closure times are as follows:

September 11, 8:00 PM to September 16 (weather permitting) - Liberty Road will be closed at the Sherwood Drive access. This traffic impact is required to allow for a Storm Sewer instillation as part of the Northeast Anthony Henday Drive project. Traffic will be detoured to the access off the Clover Bar Road Interchange. Detour signage will be in place to direct commuters.

September 8, 5:00 PM to 5:00 AM, September 10 - The eastbound Yellowhead Trail to southbound Broadmoor Boulevard ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Sherwood Drive Interchange and the Clover Bar Interchange. Detour signage will be in place to direct commuters.

September 3 - The new northbound Anthony Henday Drive to eastbound Sherwood Park Freeway ramp will be opened to commuters (weather permitting).

September 3 - The new southbound Anthony Henday Drive to westbound Sherwood Park Freeway ramp will be opened to commuters (weather permitting)

September 3 - The northbound Anthony Henday Drive ramp to westbound Sherwood Park Freeway will be temporarily closed. This traffic impact is required to bring the road elevation to the same alignment as the new lanes on the Northeast Anthony Henday Drive. Traffic will be detoured to the three existing loops ramps at the Sherwood Park Freeway and Anthony Henday Drive Interchange. Detour signage will be in place to direct commuters.

August 2015

August 30 - The new northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be opened to commuters (weather permitting).

August 30 - The new 153 Avenue and Anthony Henday Drive will be opened to commuters (weather permitting).

August 29, 5:00 PM to August 31, 5:00 AM - The westbound Baseline Road to southbound Anthony Henday Drive turn movement will be closed. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. A detour route will be available via 34 Street and Sherwood Park Freeway. Detour signage will be in place to direct commuters.

August 28, 10:00 AM to 2:00 PM - The eastbound Sherwood Park Freeway ramp to southbound Anthony Henday Drive will be closed. This traffic impact is required to allow for a high mast removal as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the three remaining loops ramps at the Sherwood Park Freeway and Anthony Henday Drive Interchange. Detour signage will be in place to direct commuters.

August 27, 8:00 PM to 5:00 AM - The Northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. At this time, Yellowhead Trail (eastbound and westbound) will be reduced to one lane of traffic in both directions. A detour route will be available by heading northbound on Anthony Henday Drive, and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

August 27, 8:00 PM to 5:00 AM - The eastbound to southbound ramps at Broadmoor Boulevard at the Sherwood Drive Interchanges will be closed. This impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the Clover Bar Interchange. Detour signage will be in place to direct commuters.

August 25 & 26, 8:00 PM to 5:00 AM (nightly)- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. At this time, Yellowhead Trail (eastbound and westbound) will be reduced to one lane of traffic in both directions. Traffic will be detoured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 21, 8:00 PM to August 24, 5:00 AM- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to demolish a bridge in the area, and to install a culvert. Traffic will be detured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 21, 8:00 PM to August 24, 5:00 AM- The southbound Anthony Henday Drive ramp to westbound Baseline Road / 101 Ave will be closed. Commuters will still be able to turn east into Sherwood Park at this time. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured south on Anthony Henday Drive to exit westbound on Sherwood Park Freeway

August 20 - The new eastbound Baseline Road to northbound Anthony Henday Drive directional ramp will be opened to commuters.

August 16, 9:00 PM to 12:00AM, August 17 - Anthony Henday Drive under Baseline Road will be rerouted to allow for the demolition of the west span of the existing Baseline Road Bridge in the area. Commuters will be redirected around the demolition using the existing ramps in the intersection. Police presence will be on site to direct commuters.

August 15, 7:00 PM to 10:00 AM, August 16 - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to work on the new bridges over the ramp. Traffic will be detoured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 14, 7:00 PM to 5:00 AM, August 17 - Baseline Road (westbound and eastbound) will be reduced to a single lane west of the Baseline Road - Anthony Henday Drive Interchange. This impact is required to install utilities as part of the Northeast Anthony Henday Drive Project.

August 13 to 16 - The mainline traffic of Anthony Henday Drive between Petroleum Way and Sherwood Park Freeway will be rerouted onto the new northbound lanes. This will allow for the existing lanes to be rebuilt. Detour signage will be in place to direct commuters.

August 11, 8:00 PM to 5:00 AM, August 12 - Wye Road (eastbound and westbound) will be closed over Anthony Henday Drive. This traffic impact is required for a concrete pour as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

Detour routes are as follows:

August 10, 8:00 PM to 5:00 AM, August 11 - The directional ramp connecting Westbound Yellowhead Trail to southbound Anthony Henday Drive will be closed. This impact is required to allow crews to work on the new bridge in the Yellowhead Trail - Broadmoor Boulevard / 17 Street NE Interchange. Traffic will be detoured to the 17 Street NW exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 10, 8:00 PM to 5:00 AM, August 11- Eastbound Sherwood Park Freeway under 17 Street Bridge Interchange will be closed. This is to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured via 34 Street to 76 Avenue to access Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 9, 7:00 PM to 5:00 AM, August 10- Westbound Sherwood Park Freeway under the 17 Street Interchange will be closed. This is to allow for a girder erection as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured via Anthony Henday Drive to Baseline Road or Whitemud Drive. Detour signage will be in place to direct commuters.

August 7, 7:00 PM to 5:00 PM, August 10 - The northbound Anthony Henday Drive directional ramp to eastbound Wye Road will be closed. This traffic impact is required for a culvert instillation as part of the Northeast Anthony Henday Drive Project. A detour route will be available via Township Rd 522 / Whitemud Drive Interchange or Baseline Road Interchange. Detour signage will be in place to direct commuters.

August 4 8:00 PM to 5:00 AM - Anthony Henday Drive under Baseline Road will be rerouted to allow for the demolition of the east span of the existing Baseline Road Bridge in the area. Commuters will be redirected around the demolition site using the existing ramps in the intersection. Police presence will be on site to direct commuters. Detour signage will be in place to direct commuters.

July 2015

July 31, 11:00 PM- The new Baseline Road Bridge crossing over Anthony Henday Drive will be opened. All existing traffic will be rerouted onto the new bridge in the area. Detour signage will be in place to direct commuters.

July 29 - 31- The northbound Anthony Henday Drive directional ramp to westbound Baseline Road will be closed. This traffic impact is required to reroute all existing traffic onto the new Baseline Road Bridge over Anthony Heday Drive. When the ramp reopens on July 31, it will be on the new permanent alignment on Baseline Road. Commuters will be detoured to Shivam Road to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

July 27, 6:00 PM to 10:00 PM. The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

July 24, 7:00 PM to 5:00 AM July 27 - The southbound Anthony Henday Drive directional ramp to westbound Sherwood Park Freeway will be closed. This traffic impact is required to install a culvert within the Northeast Anthony Henday Project limits. A detour will be available via the Baseline Road or Whitemud Drive Interchange. Detour signage will be in place to direct commuters.

July 20, 21, & 25- 8:00 PM to 6:00 AM - Meridian Street and Hayter Road will be closed south of the CN Rail Crossing in the area. This traffic impact is required for a concrete pour for a new bridge crossing the CN Rail in the area. A detour will be available via heading north at the Sherwood Drive and Yellowhead Trail Interchange, left on 121 Ave, right on 17 Street NE, left on 127 Ave, to Aurum Road. Detour signage will be in place to direct commuters.

July 19 & 24- 8:00 PM to 6:00 AM - Meridian Street, north of the CN Rail crossing in the area will be closed. This traffic impact is required for a concrete pour for a new bridge crossing the CN Rail in the area. A detour will be available by heading north at the Sherwood Drive and Yellowhead Trail Interchange, left on 121 Ave, right on 17 Street NE, left on 127 Ave, to Aurum Road. Detour signage will be in place to direct commuters.

July 18, 9:00 PM to 5:00 AM & July 19, 8:00 PM - 12:00 AM. The northbound Anthony Henday drive ramp to eastbound Yellowhead Trail will be closed. This impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. A detour route is available by heading northbound on Anthony Henday Drive, and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

July 17, 7:00 PM to July 20, 5:00 AM - The eastbound Baseline Road directional ramp to southbound Anthony Henday Drive will be closed. At this time, eastbound and westbound Baseline Road will be reduced to one lane of traffic in each direction. This traffic instillation is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. A detour route will be available for commuters via 34 Street or 17 Street. Detour signage will be in place to direct commuters.

July 13, 7:00 PM - The westbound Yellowhead Trail to northbound Broadmoor Boulevard ramp will be closed. This traffic impact is required to complete the drainage requirements in the area due to the recent heavy rainfall activity. A detour will be available via the Sherwood Drive Interchange off Yellowhead Trail. Detour signage will be in place to direct commuters.

July 11, 11:00 PM to 3:00 AM - The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for an overhead sign instillation for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

July 11, 6:00 PM to 7:00 AM - The eastbound Anthony Henday Drive ramp to Northbound Manning Drive will be closed to allow for bridge work in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

July 10, 7:00 PM to 5:00 AM - The directional ramp connecting southbound Anthony Henday Drive to westbound Wye Road will be closed. This traffic impact is required to allow for a culvert instillation as part of the Northeast Anthony Henday Drive Project. A detour route will be available via Baseline Road to 34 Street or via Whitemud Drive and 17 Street. Detour signage will be in place to direct commuters.

July 4, 4:30 AM. The new directional ramp connecting westbound Wye Road to the new northbound Anthony Henday Drive will be open to commuters heading for Baseline Road only. Detour signage will be in place to direct commuters.

July 4, 4:30 AM to 12:01 AM, July 9. The existing directional ramp connecting westbound Wye Road to northbound Anthony Henday Drive will be permanently closed. Traffic will be detoured to the three loop ramps on the Wye Road - Anthony Henday Drive Interchange. Detour signage will be in place to direct commuters.

July 4, 4:30 AM. The existing directional ramp connecting northbound Anthony Henday Drive to Baseline Road will be permanently closed. The new ramp located south of the old ramp will be open to commuters. Detour signage will be in place.

June 2015

June 29  - The directional ramp connecting westbound Baseline Road to northbound Anthony Henday Drive will be closed. This impact is required to allow for the new ramp to be constructed. Detour signage will be in place to direct commuters.

June 25, 11:00 PM to 6:00 AM. 18 Street will be closed under the new bridge in the area to allow for bridge work as part of the Northeast Anthony Henday Drive Project (weather permitting). A detour route will be available by continuing straight on 153 Ave until it turns into Fraser Way, to turn left on Meridian Street, to turn left on 167 Ave to access Fort Road or 18 Street. Detour signage will be in place to direct commuters.

June 22, 8:00 PM to 5:00 AM. The directional ramp connecting westbound Yellowhead Trail to southbound Anthony Henday Drive will be closed (weather permitting). This impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street exit off Yellowhead Trail to access Baseline Road, to access Anthony Henday Drive. Detour signage will be in place to direct commuters

June 19, 8:00 PM to 5:00 AM, June 22. The directional ramp connecting northbound Anthony Henday Drive to eastbound Yellowhead Trail will be closed (weather permitting). This traffic impact is required to install a culvert within the Northeast Anthony Henday Project limits. A detour will be available by continuing northbound on Anthony Henday Drive, to access westbound Yellowhead Trail to exit onto 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

June 18, 8:00 PM to 5:00 AM. The eastbound Yellowhead Trail to Broadmoor ramp will be closed. A detour will be available via the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

June 16, 8:00 PM to 5:00 AM. The directional ramp connecting westbound Yellowhead Trail to southbound Anthony Henday Drive will be closed. At this time, westbound Yellowhead Trail will be reduced to one lane. This impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

June 16, 12:00 AM to 5:00 AM. 18 Street will be closed under the new bridge in the area to allow for bridge work as part of the Northeast Anthony Henday Drive Project, A detour route will be available by continuing straight on 153 Ave until it turns into Fraser Way, to turn left on Meridian Street, to turn left on 167 Ave to access Fort Road or 18 Street. Detour signage will be in place to direct commuters.

June 15, 12:00 AM to 5:00 AM. 18 Street will be closed under the new bridge in the area to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. A detour route will be available by continuing straight on 153 Ave until it turns into Fraser Way, to turn left on Meridian Street, to turn left on 167 Ave to access Fort Road or 18 Street. Detour signage will be in place to direct commuters.

June 9 - 12, 7:00 PM to 6:00 AM (nightly). The directional ramp connecting westbound Baseline Road to northbound Anthony Henday Drive will be closed. This traffic impact is required for earthwork activities for the Northeast Anthony Henday Drive Project. Traffic will be detoured to northbound Broadmoor Boulevard to access the new directional ramp to the Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

June 5, 11:00 PM to June 7, 10:00 AM. Eastbound Yellowhead Trail will be closed under the Broadmoor Boulevard Bridge. Also at this time the directional ramp from northbound Anthony Henday Drive to eastbound Yellowhead Trail will be closed. This traffic impact is required to demolish the existing bridge over the Yellowhead Trail at Broadmoor Boulevard. During this closure, eastbound traffic will be detoured via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

June 6, 12:00 AM to June 7, 10:00 AM. Westbound Yellowhead Trail will be closed under the Broadmoor Boulevard Bridge. This traffic impact is required to demolish the existing bridge over the Yellowhead Trail at Broadmoor Boulevard. During this closure, westbound traffic will be detoured via the new Sherwood Drive Interchange. Detour signage will be in place to direct commuters.

June 6, 2015 - Sherwood Drive
Sherwood Drive Interchange is scheduled to open providing all directional access to and from Yellowhead Trail (weather permitting). There will be two signalized intersections at the ramp intersections, to ensure safe left-hand turns. Two lanes of traffic will be available in each direction, with separate left-hand turning lanes.

June 6, 2015 - Broadmoor Boulevard
Existing overpass closure to facilitate construction of the new Yellowhead Trail/Broadmoor Blvd interchange. Broadmoor Blvd overpass will not be closed until the new Sherwood Drive Interchange has been opened.

For a detour route map, please click here.

May 2015

May 24, 12:00 AM (30 minute closure). Westbound Wye Road will be closed at Ordze Road for 30 minutes. This traffic impact is required to allow for a sign installation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to westbound Wye Road to access Sherwood Drive. Detour signage will be in place to direct commuters.

May 23, 6:00 PM to 6:00 AM. The northbound Anthony Henday Drive ramp to eastbound Wye road will be closed. This impact is required to allow for bridge work as part of the new Sherwood Park Freeway Interchange. Traffic will detour via Whitemud Drive or Baseline Road. Detour signage will be in place to direct commuters.

May 19, 7:00 PM to 5:00 AM. The westbound Yellowhead to southbound Broadmoor loop ramp will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive project. Traffic will be detoured to Clover Bar Road or to the 17 Street exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

May 19, 7:00 PM to 5:00 AM. The westbound Yellowhead Trail ramp to southbound Anthony Henday Drive will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

May 12, 7:00 PM to 5:00 AM, May 13. The westbound Yellowhead Trail ramp to southbound Anthony Henday Drive will be closed. This traffic impact is required to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the 17 Street exit off Yellowhead Trail to access eastbound Yellowhead Trail to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

May 10, 8:00 PM to 5:00AM, May 11. Westbound Sherwood Park Freeway will be closed. This traffic impact is required for a concrete pour as part of the Northeast Anthony Henday Drive Project. A detour will be available via the Anthony Henday Drive exit to Baseline Road or to the southbound loop ramp exit onto Whitemud Drive. Detour signage will be in place to direct commuters.

May 10, 7:00 PM. The eastbound Sherwood Park Freeway to 17 Street ramp will be closed. This traffic impact is required to elevate the 17 Street Interchange to bring it to the new alignment as part of the Northeast Anthony Henday Drive Project. A detour route is available through the interchange constructed at 76 Ave and Sherwood Park Freeway. Detour signage will be in place to direct commuters.

May 9, 6:00 PM to May 10, 6:00 AM. The northbound Anthony Henday Drive ramp to eastbound Wye Road will be closed. This traffic impact is required to work on a new bridge in the Sherwood Park Freeway Interchange. Traffic will detour via Whitemud Drive or Baseline Road. Detour signage will be in place to direct commuters.

May 9, 7:00 AM to 12:00 PM. The westbound Whitemud Drive ramp to southbound Anthony Henday Drive will be closed. This traffic impact is required for a sign installation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured to the three loop ramps on Whitemud Drive. Detour signage will be in place to direct commuters.

May 8, 8:00 PM to May 9, 8:00 PM. Eastbound and westbound Yellowhead Trail will be closed under the Meridian Street Bridge. This traffic impact is required to demolish the existing bridge over the Yellowhead Trail. When traffic is reinstated, it will be on the new alignment, crossing the new bridge over Yellowhead Trail. During the closure, eastbound Traffic will be detoured via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Westbound traffic will be detoured via the westbound Yellowhead Trail to southbound Anthony Henday Drive ramp to Baseline Road to continue west, to 17 Street to continue north, and then exit onto westbound Yellowhead Trail via Hayter Road. Detour signage will be in place to direct commuters.

May 8, 2:00 AM. Meridian Street, north of Yellowhead Trail, will be closed to allow for the new road alignment to be constructed. Northbound and southbound Meridian Street will be closed at this time. Traffic will be detoured via the exit onto 17 Street to access Hayter Road. Detour signage will be in place to direct commuters.

May 8, 9:00 AM - The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed to allow for the new road alignment to be opened. The loop ramp will remain closed until the new eastbound to northbound loop ramp on the new alignment can be opened. This road work will take two weeks to construct (weather permitting). Traffic will be detoured via the exit onto 17 Street to access Hayter Road. Detour signage will be in place to direct commuters.

May 4, 8:00 PM to 5:00 AM. Sherwood Park Freeway will be closed under the 17 Street overpass to allow for a concrete pour for the new 17 Street Interchange. Eastbound traffic will be detoured via 34 Street to Baseline Road and Whitemud Drive. Westbound traffic will be detoured via the Anthony Henday Drive to Baseline Road to Whitemud Drive. Detour signage will be in place to direct commuters.

May 1, 2015 to September 30, 2015. The 17 Street bridge over Sherwood Park Freeway will be closed. This closure is required to demolish the existing 17 Street bridge and reconstruct the interchange at 17 Street in its entirety. A temporary traffic intersection will be constructed where the old 76 Avenue flyover was to assist the flow of traffic in the area. Detour signage will be in place to direct commuters.

May 1, 8:00 PM to May 4, 5:00 AM. Closure of Sherwood Park Freeway under the 17 Street Bridge overpass. This traffic impact is required to demolish the bridge in the 17 Street Interchange. Eastbound traffic will be detoured via 34 Street to Baseline Road and Whitemud Drive. Westbound traffic will be detoured via the Anthony Henday Drive to Baseline Road or Whitemud Drive. Detour signage will be in place to direct commuters.

May 1, 7:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to work on a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail to 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

May 1, 3:00 AM to 3:30 AM. Westbound Yellowhead Trail will be closed just east of the Clover Bar Interchange. This is to allow for a overhead sign installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 2015

April 30. 11:00 PM to 11:30 PM. Eastbound Yellowhead Trail will be closed just west of the Clover Bar Interchange. This is to allow for a overhead sign installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

April 30, 8:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to work on a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail to 17 Street, to access eastbound Yellowhead, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

April 27 & 28 (nightly). 6:00 PM to 5:00 AM. Eastbound Yellowhead Trail from Meridian Street to Broadmoor Boulevard, and the northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail, will be closed. This traffic impact is required to install girders for the new bridge in the Broadmoor Boulevard Interchange. Eastbound Yellowhead Trail will be detoured to take the exit ramp to southbound Anthony Henday Drive to Baseline Road. Northbound Anthony Henday Drive will be detoured to take an early exit onto Baseline Road. Both detoured traffic will then continue eastbound on Baseline Road, to head north on Broadmoor Boulevard to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters. The schedule for this impact is as follows:

April 24, 25 & 26 (nightly). Westbound Yellowhead Trail will be reduced to one lane and detoured to the service road north of Yellowhead Trail, and use the ramp at 17 Street to continue west. This traffic impact is required to install girders for the new bridge in the Broadmoor Boulevard Interchange. Northbound Broadmoor traffic heading for the service road will be detoured to use 121 Avenue, 21 Street, and 119 Avenue. Detour signage will be in place to direct commuters. The schedule for this impact is as follows:

April 22 & 23 (nightly). The westbound Yellowhead Trail exit to southbound Anthony Henday Drive and Broadmoor Boulevard, and the exit ramp from Broadmoor Boulevard/17Street to southbound Anthony Henday Drive will be closed. This traffic impact is required to prepare for the upcoming girder erection for the new bridge for the Broadmoor Boulevard Interchange. A detour route will be available by exiting onto Clover Bar Road and heading eastbound on Lakeland Drive. Northbound Broadmoor traffic will take the exit to Broadmoor from Lakeland Drive and southbound Anthony Henday Drive traffic will head south on Broadmoor Boulevard, continue east on Baseline Road and take the exit ramp to Anthony Henday. Detour signage will be in place to direct the commuters. The schedule for this impact is as follows:

April 18, 7:00 AM to April 19, 7:00 AM. 17 Street will be closed south of 90th Ave to north of the 17 Street Bridge over Sherwood Park Freeway. This impact is required to install a culvert under the road in the area. Southbound traffic will be detoured at the 17 Street Baseline Intersection, west to 34 Street. Northbound traffic will be detoured at 34 Street on Sherwood Park Freeway. Detour signage will be in place to direct commuters.

April 18, 7:00PM to April 19, 8:00AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to work on a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail to 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

April 14, 10:00 PM to 5:00 AM, April 15. Eastbound and Westbound Yellowhead Trail will be reduced to one lane of traffic in each direction under the Meridian Street Bridge. Eastbound Yellowhead Trail will be detoured onto the westbound Yellowhead Trail lanes. The purpose of this traffic impact is to accommodate a concrete pour for the new northbound Anthony Henday Drive to westbound Yellowhead Trail flyover in the Yellowhead Trail Interchange. Detour signage will be in place to direct commuters.

April 11 (7:00 AM) - May 18. The westbound Anthony Henday Drive ramp to northbound Meridian Street will be closed to allow for bridge installation activities for the new northbound Anthony Henday Drive to westbound Yellowhead Trail flyover in the Yellowhead Trail Interchange. A detour route will be available by exiting onto Hayter Road eastbound to access Meridian Street northbound, Detour signage will be in place to direct commuters.

April 8, 8:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow crews to work on a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

April 8, 8:00 PM to 11:00 PM. The southbound Anthony Henday Drive ramp to westbound Baseline road will be closed to allow girders to be delivered for a new bridge in the area. A detour will be available via Yellowhead Trail or Sherwood Park Freeway. Detour signage will be in place to direct commuters.

April 6 & 4, 10:00 PM to 5:00 AM (each night). Eastbound Yellowhead Trail, under Meridian Street Bridge will be closed. This traffic impact is required for bridge installation activities for the new northbound Anthony Henday Drive to westbound Yellowhead Trail flyover in the Yellowhead Trail Interchange. A detour route will be available via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

April 2, 9:00 AM to April 3, 5:00 AM. Anthony Henday Drive southbound before the Baseline Road intersection, will be reduced to one lane. This traffic impact is required to repair the road in the area. One lane will remain open at this time for commuters. Please plan your route accordingly.

March 2015

March 28, 7:00 PM to 10:00 AM and March 29, 7:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for crews to work on a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

March 28, 7:00 PM to 7:00 AM. The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow crews to pour concrete for a new bridge in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left of 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

March 21, 8:00 AM to 8:00 PM. The northbound Anthony Henday Drive ramp to eastbound Wye Road will be closed to allow for a concrete pour within the Northeast Anthony Henday Drive Project limits. A detour route will be available via Township Road 522 or Baseline Road. Detour signage will be in place to direct commuters.

March 20, 9:00 AM to 3:00 PM. The westbound Yellowhead Trail ramp to northbound Meridian Street will be closed. This traffic impact is required for bridge installation activities for the new northbound Anthony Henday Dive to westbound Yellowhead Trail flyover in the Yellowhead Trail Interchange. A detour route is available by exiting onto Hayter Road eastbound to access Meridian Street northbound. Detour signage will be in place to direct commuters.

March 11, 8:00 PM to 5:00 AM. Northbound and southbound Anthony Henday Drive will be reduced to one lane of traffic under the Sherwood Park Freeway Interchange. Southbound Anthony Henday Drive will be detoured onto the northbound Anthony Henday Drive lanes. The purpose of this traffic impact is to accommodate a concrete pour for the new Sherwood Park Freeway Interchange. Detour signage will be in place to direct commuters.

March 9 to 12, 10:00 PM to 4:00 AM (each night). Eastbound Yellowhead Trail, under Meridian Street Bridge will be closed. This traffic impact is required for bridge installation activities for the new northbound Anthony Henday Drive to westbound Yellowhead Trail flyover in the Yellowhead Trail Interchange. A detour route will be available via the eastbound Yellowhead Trial to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

March 6, 9:00 PM to 9:00 AM and March 7, 8:00 PM to 9:00 AM. Broadmoor Boulevard Bridge over Yellowhead Trail will be closed. This traffic impact is required to install piling for a new bridge for the Broadmoor Boulevard Interchange. A detour route will be available by exiting onto southbound Anthony Henday Drive or exiting onto Clover Bar Road. Detour signage will be in place to direct commuters.

March 1, 7:00 PM to 5:00 AM. Northbound and southbound Anthony Henday Drive will be reduced to one lane of traffic under the Sherwood Park Freeway Interchange. Northbound Anthony Henday Drive will be detoured onto the southbound Anthony Henday Drive lanes. The purpose of this traffic impact is to accommodate a concrete pour for the new Sherwood Park Freeway Interchange. Northbound traffic can either use the crossover to continue north or take the NB-EB ramp to go east or west. Detour signage will be in place to direct commuters.

March 1, 7:00 AM to 9:00 PM. The Northbound Anthony Henday Drive ramp to eastbound / westbound Baseline Road will be closed to allow for a culvert Installation. Traffic will be detoured via Sherwood Park Freeway / Wye Road or Yellowhead Trail. Detour signage will be in place to direct commuters.

February 2015

February 24, 12:00 AM to 3:00 AM. Westbound Sherwood Park Freeway will be closed to allow for a crane to be moved within the Northeast Anthony Henday Project limits. A detour will be available via Baseline Road or Whitemud Drive. Detour signage will be in place to direct commuters.

February 20-23 (nightly). Anthony Henday Drive (northbound and southbound) traffic will be redirected around the Sherwood Park Freeway Intersection to allow for a girder erection within the new Sherwood Park Freeway Interchange. Commuters will use the existing ramps to continue onto northbound and southbound Anthony Henday Drive. Eastbound and westbound Sherwood Park Freeway will be closed at this time. The closure times are as follows:

Detour Routes are as follows:

February 21, 10:00 AM to 2:00 PM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be repaired for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

February 13 - 15. Nightly closures of Sherwood Park Freeway under the 17 Street Bridge overpass. This traffic impact is required to erect girders for the new 17 Street Bridge in the area. Eastbound traffic will be detoured via 17 Street to Baseline Road and Whitemud Drive. Westbound traffic will detoured via the Anthony Henday Drive to Baseline Road or Whitemud Drive. Detour signage will be in place to direct commuters. The closure times are as follows:

February 10 & 11, 9:00 PM to 5:00 AM (each night). Eastbound Yellowhead Trail, under Meridian Street Bridge will be closed to allow for form work for a new bridge as part of the Northeast Anthony Henday Drive Project. A detour route will be available via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

February 6 - 10 (nightly) - Anthony Henday Drive (northbound and southbound) traffic will be redirected around the Baseline Road Intersection to allow for a girder erection for a new Baseline Road Bridge. Commuters will use the existing ramps to continue onto northbound and southbound Anthony Henday Drive. Police officers will be present at the time of the closure. Detour signage will be in place to direct commuters. The reroute times are as follows:

January 2015

January 24, 9:00 PM to 9:00 AM. Eastbound Yellowhead Trail, under Meridian Street Bridge will be closed to allow for a concrete pour for a new bridge in the area as part of the Northeast Anthony Henday Drive Project. A detour route will be available via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

January 24, 2:30 AM to 3:00 AM. Eastbound Yellowhead Trail will be closed just west of the 17 Street interchange. This is to allow for a overhead sign installation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured via Victoria Trail. Detour signage will be in place to direct commuters.

January 23, 11:00 PM to 1:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be repaired for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting  onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

January 23, 9:00 PM to 1:00 AM. Westbound Yellowhead Trail will be closed between Broadmoor Boulevard and Sherwood Drive to allow for an overhead sign installation as part of the Northeast Anthony Henday Drive Project. Traffic will be detoured via Clover Bar Road to Lakeland Drive to Broadmoor Boulevard to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

January 17, 9:00 PM to 7:00 AM January 18. Eastbound Yellowhead Trail, under Meridian Street Bridge will be closed to allow for bridge form work for a new bridge in the area as part of the Northeast Anthony Henday Drive Project. A detour route will be available via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters.

January 17, 5:00 AM to 9:00 AM. Eastbound Yellowhead Trail will be reduced to one lane just west of the Beverly Bridge. This will require a double right lane closure, to allow for a Cantilever Sign Installation as part of the Northeast Anthony Henday Drive Project. Detour signage will be in place to direct commuters.

December 2014

December 21, 6:00 AM to 6:00 PM - Petroleum Way will be closed to allow for a concrete pour as part of the Northeast Anthony Henday Drive Project. There will be a hard closure at this location, to allow for safe construction practices. Traffic will detour via Broadmoor / Baseline Road and 17 Street. Detour signage will be in place to direct commuters.

December 13, 10:00 AM to 2:00 PM - The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be repaired for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

December 11- Midnight to 1:00 AM December 12 - The eastbound Yellowhead Trail ramp to southbound Anthony Henday Drive will be closed to allow for major light repairs. A detour will be available via the Broadmoor Boulevard Interchange and the Meridian Street Interchange. Detour signage will be in place to direct commuters.

November 2014

November 30, 6:00 AM - Surespan will be closing westbound Yellowhead Trail just east of Beverly Bridge for 3 hours. This time is subject to change based on the allotted train block given by CN Rail. This is to allow Surespan to install girders on a new CN Rail Bridge in the area. Police presence will be at the hard closure of westbound Yellowhead Trail. A detour will be available via exiting onto 17 Street south, heading west on 101 Ave, and then north on 75 Street to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 21, 11:00 AM to 3:00 PM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be repaired for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 16, 12:00 PM - Surespan will be closing westbound Yellowhead Trail just east of the Beverly Bridge for 30 minutes. At 2:00 PM there will be a second 30 minute closure. This is to allow Surespan to remove the girders on the existing CN Rail Bridge. Police presence will be at the hard closure of westbound Yellowhead Trail. A detour will be available via exiting onto 17 Street south, heading west on 101 Ave, and then north on 75 Street to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

November 15, 10:00 PM to 11:30 PM - Eastbound Yellowhead Trail will be closed to allow for a overhead sign installation. Leading up to this closure, eastbound Yellowhead Trail will be reduced to one lane beginning at 8:00 PM. At this time the traffic is stopped, there will be a hard closure of eastbound Yellowhead Trail just passed the off ramp for Broadmoor Boulevard. This closure will be accompanied by RCMP presence. Traffic will be detoured via Broadmoor Boulevard, to eastbound Lakeland Drive, to northbound Clover Bar Road, to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 31 to November 10. Eastbound Yellowhead Trial, under the Meridian Street Bridge, will be closed nightly to allow for bridge false work for a new bridge in the area as part of the Northeast Anthony Henday Drive Project. A detour route will be available via the eastbound Yellowhead Trail to southbound Anthony Henday Drive ramp to access Baseline Road. Detour signage will be in place to direct commuters. Closure times are as follows:

October 28 to November 22. Meridian Street will be closed nightly at the CN Rail in the area to allow for a girder erection for a new bridge in the area, as part of the Northeast Anthony Henday Drive Project. A detour route is available via the westbound Yellowhead Trail exit ramp, to access Hayter Road. There will be a hard closure at the CN Rail in the area, with no access north of the tracks. Closure times are as follows:

 

October 2014

October 25, 7:00 AM to October 26, 7:00 PM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead trail will be closed to allow for a culvert to be installed in the area. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 24, 7:00 PM to October 26, 7:00 AM. The eastbound Yellowhead Trail to 116 Avenue ramp will be closed to allow for a culvert installation within the Northeast Anthony Henday Project limits. At this time a single lane closure of the eastbound Yellowhead Trail will also be required. A detour route is available via the eastbound Yellowhead Trail to northbound Meridian Street loop ramp, then exiting onto westbound Yellowhead Trail, to take the Hayter Road / 17 Street exit. Detour signage will be in place to direct commuters.

October 22 to 26, 8:00 PM to 5:00 AM nightly. Meridian Street will be closed at the CN Rail in the area to allow for bridge work as part of the Northeast Anthony Henday Drive Project. Access north of the tracks will still be available via Hayter Road. A detour route is available via the westbound Yellowhead Trail exit ramp, to access Heyter Road. Detour signage will be in place to direct commuters.

October 18, 10:00 PM to 11:00 PM - Westbound Yellowhead Trail will be closed to allow for a cantilever sign installation. Leading up to this closure, westbound Yellowhead Trail will be reduced to one lane beginning at 8:00 PM. At the time the traffic is stopped, there is be a hard closure of westbound Yellowhead rail at the off ramp for Clover Bar Road. This closure will be accompanied by RCMP presence. Traffic will be detoured via Clover Bar Road, down to Lakeland Drive, Broadmoor Boulevard to access westbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 18, 7:00 PM to October 19, 7:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for crews to work on a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

October 16, 9:00 AM to 3:00 PM. The westbound Wye Road to southbound Anthony Henday Drive loop ramp will be closed to allow crews to work on a new bridge for the Anthony Henday Drive and Sherwood Park Freeway / Wye Road Interchange. A detour will be available by continuing westbound to 34 Street and traveling to the Whitemud Drive Interchange to access southbound Anthony Henday Drive. Detour signage will be in place to direct commuters.

October 10, 9:00 PM to 6:00 AM - Meridian Street southbound will be closed between the Yellowhead Trail westbound ramp and the Yellowhead eastbound to Anthony Henday Drive southbound ramp. Traffic will be detoured via Hayter Road and then back onto the Yellowhead Trail eastbound to Anthony Henday Drive southbound ramp. Detour signage will be in place to direct commuters.

October 7, 9:00 PM to 5:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be prepared to the Northeast Anthony Henday Drive Project. A detour will be available to heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

October 7, 12:00 AM to 3:00 AM - Hayter Road Closure. This traffic impact is required to allow for a concrete pour for the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive. Detour signage will be in place to direct commuters.

The northbound Anthony Henday Drive ramp to eastbound Wye Road will be closed to allow for a concrete pour for a new bridge in the Wye Road / Anthony Henday Drive interchange. A detour will be available via the Whitemud Drive Interchange or the Baseline Road Interchange. Detour signage will be in place to direct commuters.
Closure times are as follows:

October 3, 7:00 PM to Sunday October 5, 7:00 AM (continuous) - Petroleum Way will be closed to allow for a storm culvert to be installed next to Petroleum Way. There will be a hard closure at this location, to allow for safe construction practices. Traffic will detour via Broadmoor / Baseline Road and 17 Street. Detour signage will be in place to direct commuters.

September 2014

September 30, 8:00 PM to 5:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the ramp to be repaired for the Northeast Anthony Henday Drive Project. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

September 26, 7:00 PM to September 28, 7:00 AM. The westbound Baseline Road ramp connecting to northbound Anthony Henday Drive will be closed to allow for a culvert installation. The eastbound Baseline road to northbound Anthony Henday Drive turning lane will also be closed at this time. Traffic will detour by traveling north on Broadmoor Boulevard to access Yellowhead Trail to via the Sherwood Park Freeway / Wye Road Interchange. Detour signage will be in place to direct commuters.

September 21, 22, 23 & 24, from 7:00 PM to 6:00 AM nightly, the westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a girder erection for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.
The following closures will also be required for this impact:

September 19, from 8:00 PM to 8:00AM and September 20, from 7:00 PM to 8:00 AM- Northbound Anthony Henday Drive will be closed to allow for a girder erection for a new bridge in the Yellowhead Trail Interchange. A detour route will be available by taking the ramp connecting northbound Anthony Henday Drive to eastbound Yellowhead Trail, exiting onto the Broadmoor Boulevard Bridge to exit onto westbound Yellowhead Trail
The following closures will also be required during this impact:

September 17, 7:00 PM to 5:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for a crane to be moved within the Northeast Anthony Henday Project limits. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

September 15, 7:00 PM to 5:00 AM- The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

September 15, 7:00 AM to 9:00 AM - Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive. Detour signage will be in place to direct commuters.

September 11, 9:00 AM to 3:00 PM. Yellowhead Trail will be reduced to one lane in each direction. Yellowhead Trail will have the inside lanes closed to allow for a concrete pour in the center median on Yellowhead Trail by the Meridian Street Bridge. Please plan your route accordingly.

September 10 & 11, 9:00 AM to 7:00 PM each day - Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive. Detour signage will be in place to direct commuters.

September 9, 8:00 PM to 5:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for a crane to be moved within the Northeast Anthony Henday Project limits. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

August 10 to September 19. The eastbound Whitemud Drive to southbound Anthony Henday Drive ramp will be closed. A detour is available at the interchange via the EB-NB loop ramp, the NB-WB loop ramp, and the WB-SB loop ramp. Detour signage will be in place to direct commuters.

September 6 & 7 - 8:00 AM to 8:00 PM each day - Petroleum Way will be closed to allow for girders to be erected for the new Petroleum Way Bridge. There will be a hard closure at this location, to allow for safe construction practices. Traffic will detour via Broadmoor / Baseline Road and 17 Street. Detour signage will be in place to direct commuters.

September 6, 8:00 PM to 5:30 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

September 3, 8:00 PM to 5:30 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail ramp will be closed to allow for a crane to be moved within the Northeast Anthony Henday Project limits. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

September 2, 8:00 PM to 5:30 AM. Nighttime closure of eastbound Yellowhead Trail under Anthony Henday Drive (Meridian Street Bridge). This is to accommodate a concrete pour for a new Yellowhead Interchange bridge, as part of the Northeast Anthony Henday Drive project. Eastbound traffic will be detoured down the eastbound Yellowhead Trail - southbound Anthony Henday ramp, south on Anthony Henday, across Baseline road, north on Anthony Henday and then back onto Yellowhead Trail, taking the northbound Anthony Henday - eastbound Yellowhead Trail ramp.

August 2014

August 28, 8:00 PM to 5:30 AM. Nighttime closure of westbound Yellowhead Trail under Anthony Henday Drive (Meridian Street Bridge). This is to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. Westbound traffic will be detoured up onto the westbound Yellowhead Trail - northbound Anthony Henday Drive ramp. Traffic will then detour onto the southbound Anthony -westbound Yellowhead Trail ramp in order to continue going westbound on Yellowhead Trail. Detour signage will be in place to direct commuters

August 27, 6:00 PM to 6:00 AM. The westbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow crews to pour concrete to a new bridge in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

August 24, 5:00 PM to 6:00 AM - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow crews to pour concrete for a new bridge in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

August 23, 7:00 PM to 8:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

August 23, 6:00 AM until August 25, 3:00 PM - Wye Road eastbound will be reduced to one lane to allow for a new bridge to be constructed in the Wye Road / Anthony Henday Drive Intersection. There will be one lane of traffic available at all times.

August 21, 6:00 PM to 6:00 AM - The eastbound Anthony Henday Drive ramp to northbound Manning drive will be closed to allow crews to pour concrete for a new bridge in the Manning drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

August 21, 7:00 PM to 5:00 AM. The westbound Yellowhead trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

August 18 - The left lane of eastbound Yellowhead Trail under the Meridian Street Bridge, will be closed until 3:00 PM for road repairs. There will be one lane of traffic available at all times.

August 17 - 18 Street will be reopened (weather permitting).
August 19, 8:00 PM- The intersection of Fort Road and 167 Ave will be closed (weather permitting). There will be a connector road between 18 Street and Fort Road constructed proir to this closure. A detour is available by using 18 Street, 167 Ave to Fort Road. Detour signage will be in place to direct commuters.

August 16, 12:00 PM to August 17, 7:00 PM. The westbound Baseline Road ramp connecting to northbound Anthony Henday Drive will be closed to allow for a culvert installation. The eastbound Baseline road to northbound Anthony Henday Drive turning lane will also be closed at this time. Traffic will detour by traveling north on Broadmoor Boulevard to access Yellowhead Trail or via the Sherwood Park Freeway / Wye Road Interchange. Detour signage will be in place to direct commuters.

August 14, 9:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 13, 7:00 PM to 5:00 AM. The westbound Yellowhead trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

August 11, 9:00 AM to August 12, 6:00 AM. Northbound Anthony Henday Drive just south of the northeast Whitemud Interchange, will be restricted to one lane so that the road can be repaired. Please pay attention to traffic signage. There will be one lane of traffic available at all times.

August 10 to September 19. The eastbound Whitemud Drive to southbound Anthony Henday Drive ramp will be closed. A detour is available at the interchange via the EB-NB loop ramp, the NB-WB loop ramp, and the WB-SB loop ramp. Detour signage will be in place to direct commuters.

August 10, 7:00 AM to 7:00 PM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for the road to be repaired. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

August 9, 7:00 AM to August 10, 7:00 AM. The northbound Anthony Henday Drive ramp to eastbound Baseline Road will be closed to allow for a culvert installation. Traffic will detour by traveling north on Sherwood Drive to access Baseline road or via the northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail. Detour signage will be in place to direct commuters.

August 9, 7:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive. Detour signage will be in place to direct commuters.

August 6, 7:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

July 2014

July 31, 12:00 PM. 153 Ave will be closed between Victoria Trail and Meridian Street to allow for the road to be repaired. The detour route will be Meridian Street, 167 Avenue, and Fort Road. To minimize disruption, the section of 167 Avenue which is currently closed between 18 Street and Fort Road will be reopened so that drivers are not required to use the current 18 Street / Fort Road detour. Detour signage will be in place to direct commuters.

July 25, 8:00 PM - July 28 - 6:00 AM. Petroleum Way will be closed (just west of Anthony Henday Drive) to allow for a bridge to be demolished in the area. Traffic will detour via Broadmoor / Baseline Road and 17 Street. Detour signage will be in place to direct commuters.

July 22, 8:00 PM - 5:00 AM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail interchange. A detour will be available by heading northbound on Anthony Henday Drive and exiting onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

July 21 - 25, 7:00 PM to 5:00 AM nightly. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

July 18, 8:00 PM - July 21, 6:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a Bridge demolition as part of the Northeast Anthony Henday Drive Project. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

July 14, 5:00 AM - 167 Ave will be closed between 18 Street and Ford Road. Westbound traffic on 167 Ave will be detoured north on 18 Street and then southwest on Fort Road in order to access Westbound 167 Ave. Eastbound traffic on 167 Ave will be detoured onto Fort Road and then south on 18 Street in order to access Eastbound 167 Ave. This closure will remain in place for 2 weeks (weather permitting).

July 11 - 13. Petroleum Way will be closed during the days to allow for bridge piling activities. There will be a hard closure at this location. Traffic will detour via Broadmoor / Baseline Road and 17 St. Detour signage will be in place to direct commuters. Closure times are as follows:

July 10 - 17. The westbound Township Road 522 / Highway 628 to northbound Anthony Henday Drive ramp will be closed (weather permitting). A detour is available at the interchange via the WB-SB loop ramp, SB-EB loop ramp, and the EB-NB loop ramp. Detour signage will be in place to direct commuters.

July 7 - 12 - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow crews to work on the new Bridge in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters. Ramp closure times are as follows.

July 3 to 5 - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow for a girder erection for a new bridge in the Manning Drive Interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters. Ramp closure times are as follows:

July 2, 7:00 PM - July 3, 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

June 2014

June 27 - 8:00 PM, until June 30 - 6:00 AM - Petroleum Way will be closed to allow for the bridge to be demolished. There will be a hard closure at this location, to allow for the safe removal of this bridge structure. Traffic will detour via Broadmoor / Baseline Road and 17 St. Detour signage will be in place to direct commuters.

June 27 - June 30 - Nighttime closures on Yellowhead Trail under Anthony Henday Drive (Meridian Street Bridge). Construction crews will close eastbound Yellowhead Trail for 2 consecutive nights, followed by a closure of westbound Yellowhead Trail for 2 consecutive nights. This is to allow for the girder installation of a new Yellowhead Interchange bridge, as part of the Northeast Anthony Henday Drive project. Closure times and detours are as follows:

June 28, 6:00 PM - June 29, 8:00 AM. Reroute of Anthony Henday Drive, and closure of Sherwood Park Freeway. This is to allow for a concrete pour for the new Sherwood Park Freeway Bridge, as part of the Northeast Anthony Henday Project. Detour routes are as follows:

June 25 + 26. The ramps on the 17 Street and 34 Street Interchanges off Sherwood Park Freeway will be closed for 1 - 2 hour periods during the night. Only one ramp will be closed at a time. This impact will take place between the hours of 7:30 PM and 5:30 AM. This will allow for the ramps to be milled and repaved. Signage will be in place to direct commuters.

June 21, 6:00 AM to 3:00 PM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for rebar to be placed for a new bridge in the Yellowhead Trail Interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

June 15, 7:00 AM - 3:00 PM. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed to place rebar for a new bridge in the Yellowhead Trail Interchange. A detour will be available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

June 14, 5:00 AM - 3:00 PM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for bridge shoring removal. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

June 11, 3:00 PM - 9:00 PM. Eastbound Yellowhead Trail will closed under the Meridian Street Bridge (northeast Anthony Henday Drive interchange) to allowed for road repairs due to weather conditions. Traffic will be detoured via the eastbound Yellowhead Trail to southboud Anthony Henday Drive Ramp to Baseline Road to access eastbound Yellowhead Trail.

June 10 & 11, 9:00 AM to 3:00 PM - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

June 7, 7:00 AM to 4:00 PM - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive. Detour signage will be in place to direct commuters.

June 5, 8:00 PM - 5:00 AM June 6 - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for a new bridge in the Yellowhead Trail Interchange. A detour is available by exiting westbound Yellowhead Trail onto 17 Street, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp. Detour signage will be in place to direct commuters.

June 2 - 5, 6:00 PM to 6:00 AM each night for 4 consecutive nights - The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed to allow for girders to be erected for a new bridge in the Manning Drive interchange. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive.

May 2014

May 28 & 29 - 9:00 PM to 5:00 AM each night, and May 30, 9:00 PM - June 2, 5:00 AM (continuous)- the northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed. This will allow for girders to be erected for a new bridge in the Yellowhead Trail Interchange. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail Westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

May 27, 9:00 PM to 5:00 AM, May 28 - the westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for girders to be erected for a new bridge in the Yellowhead Trail interchange. A detour will be available by exiting westbound Yellowhead Trail onto 17 Street/116 Avenue to access the eastbound Yellowhead Trail, to access southbound Anthony Henday Drive. That same evening the southbound Anthony Henday Drive to westbound Baseline Road ramp will be closed so that the girders can be delivered to site. A detour for this ramp closure is available via 17 Street southbound and turning left onto Baseline Road. Detour signage will be in place to direct commuters.

May 23, 9:00 PM - May 26, 5:00 AM - The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail will be closed for a continuous weekend closure. This will allow for girders to be erected for a new bridge in the Yellowhead Trail Interchange. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

May 21, May 22, and May 25. 8:00 PM to 5:00 AM each night. Nighttime lane restrictions of Yellowhead Trail under the Sherwood Drive Interchange. Yellowhead Trail will be reduced to one lane eastbound and westbound. The purpose of this traffic impact is to allow for a deck pour for the new Sherwood Drive Bridge. Crossovers will be built in the median of Yellowhead Trail on the east and west of the bridge in order to detour traffic around the work zone.

May 17 - 19. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for Pile Driving for a new bridge in the Broadmoor Blvd interchange. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail. Also, eastbound Yellowhead Trail will be reduced to 1 lane until just past Broadmoor Blvd to allow for this operation.
Closure times - NB Anthony Henday Drive to EB Yellowhead Trail Ramp.

May 15 - June 6. The northbound Anthony Henday Drive to eastbound Township Road 522/Highway 628 ramp will be closed. A detour is available at the interchange via the NB-WB loop ramp, the WB-SB loop ramp, and the SB-EB loop ramp. Detour signage will be in place to direct commuters.

May 14. 6:00 PM to 6:00 AM. The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be temporarily closed over night for a concrete pour. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive.

May 8 - 13. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for Pile Driving for the bridge in the Broadmoor Blvd interchange. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.
Closure Times - NB Anthony Henday Drive to EB Yellowhead Trail Ramp

May 9-16. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for girders to be erected for a new bridge in the Yellowhead Trail interchange. A detour is available by heading south on 17 Street, turn left onto Baseline Road eastbound and access Anthony Henday Drive southbound from Baseline Road eastbound.
Closure Times - WB Yellowhead Trail to SE Anthony Henday Drive Ramp

May 9, 6:00 PM to 6:00 AM. The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be temporarily closed over night for a concrete pour. A detour will be available by continuing onto southbound Manning Drive, then left on 144 Ave to access northbound Manning Drive.

May 2, 6:00 PM to 6:00 AM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

May 2, 9:00 PM to 5:00 AM. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a crane to be moved within the Northeast Anthony Henday Drive Project limits. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

April 2014

April 30- May 1, 9:00 PM to 5:00 AM each night. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for deck panels to be installed on a new bridge for the Yellowhead Trail Interchange. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail to access eastbound Yellowhead, and then taking the southbound Anthony Henday Drive ramp.

April 23. 9:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

April 17. 9:00 PM to 5:00 AM. The northbound Anthony Henday Drive to westbound Yellowhead Trail ramp will be closed to allow for a crane to be moved within the Northeast Anthony Henday Project limits. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.

April 14-16. Nighttime ramp closure. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow crews to erect the third and final span for the new bridge in the Yellowhead Trail Interchange. The detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street / 116 Avenue to access eastbound Yellowhead Trail.
Closure times - NB Anthony Henday Drive - EB Yellowhead Trail Ramp.

April 14. 9:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a concrete pour for the new Yellowhead Trail Interchange bridge. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail to access eastbound Yellowhead, and then taking the southbound Anthony Henday Drive ramp.

April 14. 9:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

April 11-13. Two nighttime ramp closures. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp and the southbound Anthony Henday Drive to westbound Baseline Road ramp. This traffic impact is required so that girders can be erected for the first two spans for the new bridge in the Yellowhead Trail interchange. A detour route is available by taking the 17 Street exit off westbound Yellowhead Trail. Head south on 17 Street, turn left onto Baseline Road and access Anthony Henday Drive southbound from Baseline Road eastbound.
Closure times- WB Yellowhead Trail - SB Anthony Henday Drive ramp and SB Anthony Henday Drive - WB Baseline Road ramp:

April 10. 9:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

April 8. 9:00 PM to 5:00 AM. The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a crane to be moved within the Anthony Henday Drive Project limits. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp.

April 7. 9:00 AM to 7:00 PM. Hayter Road Closure. This traffic impact is required in order to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

April 5. 8:00 PM to 8:00 AM. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a concrete pour for the Anthony Henday Drive Project. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

April 3. 12:00 PM. The eastbound Yellowhead Trail to northbound Meridian Street loop ramp will be closed for 30 minutes. This is to allow for a crane to be moved within the Anthony Henday Drive Project limits. A detour will be available via Broadmoor Blvd. Detour signage will be in place to direct commuters.

April 2-4. 9:00 AM to 3:00 PM each day. April 5 - 7:00 AM to 7:00 PM. The eastbound Anthony Henday Drive ramp to northbound Manning Drive will be closed for bridge work for the Manning Drive Interchange. A detour is available by heading southbound Manning Drive, and then via 144 Ave. Detour signage will be in place to direct commuters.

April 1- 9:00 AM to 7:00 PM. Hayter Road closure. This traffic impact is required in order to pleace rebar for the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

March 2014

March 29- 8:00 PM to 8:00 AM. The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a concrete pour for the Anthony Henday Drive Project. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

March 21, March 24, and March 26- 9:00 AM to 7:00 PM. Hayter Road closure. This traffic impact is required in order to erect pier cap formwork for the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

March 20, 10:00 PM to 2:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a power pole to be removed within the Anthony Henday Drive project limits. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp.

March 19, 10:00 PM to 5:00 AM - The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a concrete pour for the Anthony Henday Drive Project. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

March 14, 10:00 PM to 1:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a crane to be moved within the Anthony Henday Drive project limits. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive ramp.

March 11, 10:00 PM to 12:00 AM - The westbound Yellowhead Trail to southbound Anthony Henday Drive ramp will be closed to allow for a crane to be moved within the Anthony Henday Drive project limits. A detour is available by taking the 17 Street exit off westbound Yellowhead Trail, to access eastbound Yellowhead Trail, and then taking the southbound Anthony Henday Drive Ramp.

March 3, 9:00 AM to 3:00 PM - Hayter Road closure. This traffic impact is required to work on the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

February 2014

February 28 to March 3 - Reroute of Anthony Henday Drive, and closure of Sherwood Park Freeway (from 8:00 PM Friday to 6:00 AM Monday). By Monday morning, free flow traffic will be restored after crews complete the girder erection of the new Sherwood Park Freeway bridge.
NB+SB Anthony Henday Lane Closures:

Sherwood Park Freeway/Wye Road EB+WB Closures:

February 25, 12:00 AM to 3:00 PM & February 26 to 28, 3:00 AM to 3:00 PM (daily) - Northbound Anthony Henday Drive ramp to eastbound Wye Road ramp closure. Commuters are advised to detour via Baseline Road and Broadmoor Boulevard. This traffic impact is required to construction crews to erect girders for the new Sherwood Park Freeway interchange as part of the Northeast Anthony Henday Drive Project.

February 26, 10:00 PM to 5:00 AM -The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a crane to be moved within the Anthony Henday Drive project limits. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

February 21 to 25 - Nighttime lane restrictions of Yellowhead Trail under the Sherwood Drive Interchange. Yellowhead Trail will be reduced to one lane eastbound and westbound. The purpose of this traffic impact is to erect the girders for the new Sherwood Drive Bridge as part of the Northeast Anthony Henday Drive Project. Crossovers will be built in the median of Yellowhead Trail on the east and west of the bridge in order to detour traffic around the work zone.

February 19, 10:00 PM to 5:00 AM - The northbound Anthony Henday Drive to eastbound Yellowhead Trail ramp will be closed to allow for a crane to be moved within the Anthony Henday Drive project limits. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

February 19, 9:00 AM to 6:00 AM, February 20 - Hayter Road closure. This traffic impact is required in order to pour the last pier column for the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

February 14, 9:00 AM to 6:00 AM, February 15 - Hayter Road closure. This traffic impact is required in order to place rebar cages for the new bridge going over the CN Rail in the area. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

January 2014

January 30, 9:00 AM to 6:00 PM - Hayter Road will be closed for pier column construction for the Northeast Anthony Henday Drive project. Commuters will be detoured to the westbound Yellowhead Trail ramp off Anthony Henday Drive.

January 29, 11:00 PM to 4:00 AM -The northbound Anthony Henday Drie ramp to eastbound Yellowhead Trail will be closed. A detour is available by heading northbound on Anthony Henday Drive and exit onto Yellowhead Trail westbound to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

January 25, 7:00 AM to 7:00 PM - The Anthony Henday Drive northbound to Yellowhead Trail (Highway 16) eastbound Ramp will be closed this Saturday for major repairs. Traffic will be detoured westbound on Yellowhead Trail to 17 Street/ 116 Avenue to access eastbound Yellowhead Trail.

January 23, 10:00 PM to 5:00 AM- Two separate overnight ramp closures are required to move cranes into place for construction. The northbound Anthony Henday Drive ramp to eastbound Yellowhead Trail, and the westbound Yellowhead Trail ramp to northbound Meridian Street. The detour for both of these ramp closures will be via the westbound exit onto Yellowhead Trail to 17 Street/116 Avenue to access eastbound Yellowhead Trail.

January 15, 12:00 AM to 5:00 AM- Nighttime closure. Eastbound Sherwood Park Freeway will be closed between 17 Street and Anthony Henday Drive. The purpose of this traffic impact is to accommodate the crane move along Sherwood Park Freeway. A full closure is required to move the crane in a safe and efficient manner.

January 13, 9:00 AM to 6:00 AM, January 14 and January 21, 8:00 AM to 6:00 AM, January 22 - A full closure of Hayter road is required in order to place rebar cages and formwork in a safe and efficient manner for the concrete pour to take place on the January 21-22. This road closure sets the stage for the next steps in construction of the new bridge that will go over the CN Rail tracks on Meridian Street. Commuters are advised to detour via the westbound Yellowhead Trail ramp off Anthony Henday Drive.

January 12, 7:00 AM to 10:00 AM- A full closure of the northbound Anthony Henday Drive to eastbound Wye Road is required to facilitate the safe and efficient shoring tower piling for the new Sherwood Park Freeway Bridge. There are a total of 5 piles to be driven for the shoring tower which is just east of the northbound-eastbound ramp. Travelers are advised to detour via Baseline Road or Whitemud Drive for easterly access to Sherwood Park from northbound Anthony Henday Drive.

December 2013

December 19, 9:00 AM to 3:00 PM - Hayter Road will be closed to allow for a concrete pour for the future bridge that will go over the CN Rail on Meridian Street. The closure is required to ensure the safety of workers and commuters while the pour is taking place. Travelers are advised to detour via the westbound Yellowhead Trail ramp off Anthony Henday Drive.

December 15-18. Nighttime reroute of Manning Drive northbound to Anthony Henday westbound ramp. Beginning at 8:00 PM to 6:00 AM for three nights. Commuters wishing to travel on Manning Drive NB to Henday WB ramp will be redirected to facilitate the girder installation of the new Manning Interchange Bridge. A complete closure of Manning Drive NB to Henday WB ramp is required in order to erect the steel girders in a safe and efficient manner. Traffic will detour via 167 Ave and 66 St.

November 2013

November 8-11. Reroute of Anthony Henday Drive, and closure of Sherwood Park Freeway (from 8:00 PM Friday to 6:00 AM Monday. By Monday morning, free-flow traffic will be restored after crews complete the girder erection of the new Sherwood Park Freeway bridge.

NB+SB Anthony Henday Lane Closures:

Sherwood Park Freeway/Wye Road EB+WB Closures:

November 7-14. Daytime lane closures on Anthony Henday Drive under Baseline Road. Southbound Anthony Henday will be restricted to one lane, between 9:00 AM to 3:00 PM for approximately 2 days. Over the weekend, Anthony Henday Drive will be down to one lane in each direction from 7:00 AM to 7:00 PM. On Monday, northbound Anthony Henday is limited to one lane between 9:00 AM to 3:00 PM for approximately 3 days.

November 4-8. Nighttime lane closures on Meridian Street (8:00 PM to 6:00 AM). The purpose of this traffic impact is to facilitate the safe and efficient piling for the bridge over the CP Rail on Meridian Street for the Northeast Anthony Henday Project. There will be one lane of traffic open at all times.

November 2-4. Nighttime closure of Meridian St. (November 2nd from 6:00 PM to 7:00 AM, November 3rd from 6:00 PM to 5:00 AM, and November 4th from 8:00 PM to 5:00 AM). Canadian Pacific railway will be relocating the existing Meridian Spur and will require a closure of Meridian Street for three nights (weather permitting) for this work. Through traffic will be reinstated for daytime commuters.

November 1 - Sherwood Drive was closed to Yellowhead Trail traffic this late summer of 2013 to accommodate the construction of the new interchange ramps. Reopening of the Sherwood Drive ramps on the new alignment has been postponed until 2014 due to multiple overhead and underground utility relocation delays. The good news is, the bridge work at this location is progressing ahead of schedule and the Contractor is now considering, along with the Province and County, moving the opening of ramps until late summer 2014 when the fully functional Sherwood Drive interchange can be opened to the public. Once opened the new Sherwood Drive interchange will provide all directional access to both Yellowhead Trail and Sherwood Drive.

October 2013

October 8 - Sherwood Park Freeway eastbound and westbound will be have one lane of traffic in each direction during the day due to contractor experiencing challenging soil conditions during the culvert installation. The Anthony Henday NB to Sherwood Park Freeway WB ramp and the Anthony Henday SB to Sherwood Park Freeway WB ramps must remain fully closed during this time. The construction workers are working around the clock to get the traffic on Sherwood Park Freeway opened as soon as possible. Due to the rain Monday evening, the contractor expects the road to be repaved and opened today (Oct 8th). Please plan your commute accordingly.

October 4 to 7 - Beginning at 8:00 PM, Sherwood Park Freeway Westbound will be closed for Bridge Culvert Installation works. Westbound Sherwood Park Freeway will be closed at Anthony Henday Drive where traffic will be redirected to Baseline Road or Whitemud Drive via Anthony Henday Drive and 17 Street. Eastbound Sherwood Park Freeway will be reduced to one lane from west of 17 Street to west of Anthony Henday Drive. Northbound and southbound Anthony Henday Traffic will remain unaffected. Access to eastbound Sherwood Park Freeway from Anthony Henday Drive will be available during this period. Northbound Anthony Henday Drive to westbound Sherwood Park Freeway will be closed.

October 4 to 22. Hayter Road will be closed to facilitate the safe piling for Bridge 22.2 for the new Hayter Road intersection of the Northeast Anthony Henday Drive. This operation is expected to take place Friday October 4th (weather permitting) and will be in operation until the 22nd. The contractor will at all-time make provisions for traffic through the work zone to ensure the safety of commuters and construction workers.

September 2013

September 23 to 27. Nighttime Anthony Henday Drive reroute, beginning at 8:00PM to 6:00AM. Anthony Henday Drive under Baseline Road will be rerouted. The purpose of this traffic impact is to facilitate the girder erection of the new Baseline Road Bridge. A complete reroute of Anthony Henday Drive (northbound and southbound) is required in order to safely erect all 32 girders in a safe and efficient manner. Northbound and southbound traffic will detour via the ramps onto Baseline Road and continue onto Anthony Henday Drive. All traffic movements will be maintained during this operation.

September 3rd. Beginning at 8:00PM. Mainline Detour on Anthony Henday Drive. Between Sherwood Park Freeway and Yellowhead Trail, all four current lanes of traffic will shift to the newly widened southbound side so crews can begin to demolish and rebuild the northbound side. The transfer will take place during off peak hours, to minimize disruption to drivers.

August 2013

August 28 - Eastbound Yellowhead Trail to Southbound Anthony Henday Drive will be reduced to one lane for the forseeable future.

August 26 , 6:00AM - Road closure where 76 Ave turns into Meridian Street near Sherwood Park Freeway and Anthony Henday Drive. The purpose of this closure is to accommodate a pipeline relocation and the resurfacing of this portion of the road. A complete closure is required for the duration of two months (weather permitting) in order for the safe construction working zone needed for the pipeline relocation and road reworking.

August 6 to 12, 9:00AM- the third right lane of Yellowhead Trail eastbound (west of 17 Street) will be closed. This will allow for earthwork activities for the future Yellowhead Trail exit ramp onto Anthony Henday to commence.

August 1, 9:00 AM to 9:00PM - Anthony Henday Drive will be restricted to one lane in each direction to crews can safely repair the road for motorists. The inside northbound and southbound lanes will be closed for a one kilometer stretch north of Sherwood Park Freeway to re-surface an aging stretch of asphalt. To minimize disruption to traffic, the milling and paving work is coordinated to take place over one day of work.

July 2013

July 10 to Spring 2014 (Weather Permitting)- Beginning at 9:00 AM, Sherwood Drive on and off ramps will be closed for a Sanitary Line Relocation and earthwork activities in preparation for a new interchange being built to increase access and safety for motorists around the rapidly growing community of Sherwood Park. Full closure of this ramp will allow the quick, efficient and safe work to be completed. Sherwood Drive will be closed just after Emerald Drive, and Sherwood Drive traffic will be detoured onto Emerald Drive. Access to and from Sherwood Park is maintained through Broadmoor Boulevard and Clover Bar Road.

June 2013

June 21 to 24. Beginning at 7:00 PM 76 Ave- Sherwood Park Freeway Bridge will be demolished. Work will begin after evening rush hour. The demolition is expected to be complete by 6:00 AM on June 24, ensuring free-flow traffic for Monday morning commuters. To ensure a safe construction zone for workers and motorists, Sherwood Park Freeway traffic will be detoured around the work. Eastbound Sherwood Park Freeway will be closed at 17 Street, where traffic will be redirected via a 76 Avenue ramp to Sherwood Park Freeway eastbound. Westbound Sherwood Park Freeway will be closed at 17 Street at the southbound ramp onto Henday, where traffic will be redirected via Henday, Baseline Road and 17 Street. Henday access to westbound Sherwood Park Freeway will be closed, and traffic will be redirected via either Baseline Road or Whitemud Drive to 17 Street. Northbound and southbound Henday traffic will remain unaffected, as will eastbound access to Sherwood Park Freeway.

June 14 to 17, 8:00 PM - Sherwood Park Freeway will be closed and Anthony Henday Drive will be redirected to allow for the demolition of the westbound Sherwood Park Freeway Bridge. The detour route for motorists traveling between Sherwood Park and the City of Edmonton will be via; Baseline Road and Whitemud Drive for easterly travelers, and 34th Street (then on to Baseline Road and Whitemud Drive) for westerly travelers. Beginning Monday June 17th at 6:00 AM, traffic using Sherwood Park Freeway will be redirected onto the Eastbound Sherwood Park Freeway bridge and traffic will continue to flow freely with two lanes of traffic in each direction.

June 14, 7:00 PM - 76 Avenue Bridge over Sherwood Park Freeway will be closed permanently. The closure also includes the 76 Avenue access to eastbound Sherwood Park Freeway east of 9 Street. The permanent closure of 76 Avenue at Sherwood Park Freeway is required to the demolition of the 76 Avenue Bridge and the construction of the new free-flow systems interchange at Sherwood Park Freeway and Anthony Henday Drive. The detour route for traffic wishing to travel between the 76 Avenue area and Sherwood Park Freeway is via 34 Street. The new 17 Street interchange will become the permanent access point once it is constructed and open to traffic in fall 2016.

June 15 & 16-(Weather Permitting) Beginning at 1:00 AM- Manning Drive traffic will be redirected to accommodate the girder erection operation on Manning Drive with Anthony Henday Intersection Bridge. The traffic will be detoured onto 66 St and 167 Ave. The operation will take place during the day between 1:00 AM and noon. Traffic along Manning Drive will be reienstated during the evening for motorists. By Sunday afternoon, free flow traffic on Manning Drive will be reinstated for Monday morning commuters

 

May 2013

May 24 to 27- Beginning at 8PM- bridge structure demolition on Eastbound Baseline Road Bridge over Anthony Henday Drive. To ensure safe construction zone for workers and motorists, northbound and southbound traffic on Anthony Henday Drive will be redirected around the demolition site using the existing ramp intersections. Speed will be maintained. Traffic on Baseline will continue to flow freely with two lanes in each direction. Work is being done during off-peak traffic hours to minimize disruption for motorists. Beginning on Monday May 27th at 6AM, free flow traffic on the Anthony Henday will be reinstated for Monday morning commuters.

May 16- Yellowhead Service Road between Liberty Rd and 28 Street, 33rd Street between Yellowhead Service Road and Turbo Dr/121 Ave and the Yellowhead Trail off-ramp to Yellowhead Service Rd will be closed until earthworks are completed in November, 2013. Detours through Cloverbar Rd, Liberty Drive, Turbo Drive, 28 Street and 17 Street.

May 13- Traffic pattern change at Anthony Henday Drive and Baseline Road intersection. All of the following ramps will be redirected and replaced with traffic lights at each end of the intersection. This will accommodate the construction of the new Eastbound Bridge.

 

This Construction Season

All Northbound traffic on the Anthony Henday Drive will be moved over to the newly widened southbound lanes, in-between Yellowhead Trail and Sherwood Park Freeway. This is to accommodate the construction activities on the northbound lanes.

Baseline Bridge will be undergoing a cross-over detour- both the Eastbound and Westbound traffic will be moved over to the Westbound bridge with two lanes of traffic going in each direction (four lanes of traffic on each bridge). This will accommodate the construction of the new Eastbound bridge.

Sherwood Park Freeway Bridge will be undergoing a cross-over detour- both the Eastbound and Westbound traffic will be moved over to the Eastbound bridge with two lanes of traffic going in each direction (four lanes of traffic on each bridge). This will accommodate the construction of the new Westbound bridge.

Yellowhead Trail Eastbound is going to undergo two detours to accommodate construction activities. One east and one west of the Anthony Henday Drive. These detour will keep with the 2 lane traffic structure.

April 2013

April 26- Nighttime construction activities will be causing delays on Sherwood Park Fwy EB. From 9:00 PM to 6:00 AM Sherwood Park Fwy Eastbound will be closed from 17 Street to Anthony Henday Drive, for the removal of an overhead sign in that area. There will be a detour route through 17 Street for motorists.

April 23- Detour construction activities will be causing delays on Baseline Bridge over Anthony Henday Drive. This disruption will be ongoing for approximately 2 weeks. Expect traffic delays.

April 20- The Heartland Transmission Project will be condtucting a traffic disruption on Yellowhead Highway. A helicopter will be used to string rope lines over the Yellowhead Highway East by Anthony Henday Drive. Traffic on the Yellowhead will have to be stopped intermittently as the helicopter passes over the Highway. Each delay will only be a matter of minutes, and will occur several times during the day. Motorists may want to consider alternate routes.

March 2013

March 14, from 9pm-10pm the NB-WB ramp off Yellowhead and Anthony Henday Drive will be closed. The traffic will be detoured to Hater Road.

March 1st & 2nd, the westbound-southbound shoulder from Yellowhead Trail and Anthony Henday Drive will be partially closed for Geotech Drilling. Expect traffic delays.

February 2013

As of February 15, 2013 mainline Anthony Henday Drive is undergoing a speed reduction. The speed from Yellowhead to Whitemud Drive will be reduced to 80km max. Sherwood Park Freeway will reduce to 60km max from 17th Street to Sherwood Park Drive. Please be aware all the speed limits are enforced with "double speed fine" signs.

January 2013

Nighttime construction activities will be causing delays on Anthony Henday Drive in-between Baseline Bridge and Sherwood Freeway on January 25, 2013 starting at 10 PM and only for the evening.

Construction activities will be causing delays on Anthony Henday Drive-Northbound to Yellowhead Trail- Eastbound ramp. Traffic will be shifted from the right lane to the left lane on January 18, 2013.

Construction activities at Manning interchange will be affecting traffic for the foreseeable future as follows; reduced speeds, and controlled equipment crossing.

December 2012

Construction activities on Anthony Henday Drive, under the Baseline Road Bridge will be causing delays for the foreseeable future, with reduced speeds, and controlled equipment crossing.

Construction activities at Manning interchange will be affecting traffic for the foreseeable future as follows; reduced speeds, and controlled equipment crossing.

Lane closure at Yellowhead and Anthony Henday Drive in North-bound-Eastbound connector, for the foreseeable future.

November 2012

Left lane closure and 50 kph on the ramp from WB Yellowhead Trail to SB Anthony Henday Drive, for the foreseeable future.

On November 15, 2012, there will be a lane closure on the right auxiliary lane on Yellowhead Trail and Anthony Henday Drive from 10pm to 6am.

Re-alignment construction activities on Meridian Street, south of 130 Ave will be causing delays. The new alignment will be open November 6, 2012, and will maintain current traffic flows. The new alignment will be in use for the foreseeable future.

October 2012

Re-alignment construction activities on Fir Street will be causing delays. As of October 25, 2012, traffic with be underway on a new alignment.

Construction activities on Anthony Henday Drive under the Baseline Road Bridge will be causing delays for the foreseeable future, with reduced speeds, and controlled equipment crossing.

Lane closures in both Northbound and Southbound lanes, under the Baseline Road Bridge until October 15, 2012.

Lane closure at Yellowhead and Anthony Henday Drive in Northbound-Eastbound connector, for the foreseeable future.

18 Street will be closed between 167 Ave and 153Ave for the foreseeable future.

Construction activities at Manning interchange will be affecting traffic for the foreseeable future as follows; reduced speeds, reduced to single lanes, restricted shoulders, and equipment crossing roads causing possible delays.

September 2012

Construction activities at Anthony Henday Drive and Sherwood Drive will be causing delays for the month of September.

Construction activities at Yellowhead Trail and Broadmoor Blvd will be causing delays for the month of September.

On September 6th, there will be a lane closure on Sherwood park Freeway WB at 17 Street, from 6pm-6am.

On September 5th, there will be a lane closure on Sherwood Park Freeway EB at 17th Street, from 6pm-6am.

Starting on September 4th, 18 Street will be closed between 167 Ave and 153 Ave, for the foreseeable future.

August 2012

Shoulder closures on Wye Rd interchange EB-SB ramp and NB-EB ramp, starting August 9-11.

Construction activities on 153rd Ave, between 18 St and Meridian St, will be affecting traffic for the foreseeable future with reduced speeds, and controlled equipment crossing causing possible delays.

Construction activities at Manning interchange will be affecting traffic for the forseeable future as follows; reduced speeds, reduced to single lanes, restricted shoulders, and equipment crossing roads causing possible delays.

Lane closure Yellowhead WB between Meridian St and Broadmoor Blvd on August 9th from 6pm-5am (pending weather).

July 2012

Shoulder closures on the Anthony Henday between Baseline Rd and Wye during the week of July 30.

Shoulder closures on Yellowhead and Sherwood Drive for the week of July 30.

Shoulder closures on Yellowhead EB, between median and Broadmoor for the week of July 30.

Shoulder closures continue on Yellowhead Hwy the weeks of July 9-20 in both directions and the EB/SB ramp from Yellowhead to Anthony Henday.

Please drive safely and remember there will be people and equipment on some of the above mentioned roads.

June 2012

There will be some shoulder closures South of the Yellowhead Trail on the Henday, WB/SB connector road, and the NB/EB connector road, the weeks of June 18 and 25.

There will also be some shoulder closures on 17th Street near Sherwood Park Freeway.

 